BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 30, 2025 at 8:00 PM

Updated July 31, 2025

Site work and paving for a road / highway in Highland Village, Texas. Design plans call for site work for a road / highway; and for paving for a road / highway.

Plans call to design a section of the FM407 corridor trail from Highland Village Rd to the Market Place Development at Highland Village, where it will connect with the existing Market Trail and side paths. The intent is to provide a continuous trail section and identify program amenity areas along this section. The trail section and program amenity areas are to be unique to the City and region, providing a true sense of place with a boardwalk feel. Streetscapes, landscapes, mini-parks, and other amenities should be included in the design. As of July 30, 2025, the project is in design. The construction document completion timeline has not been released. A tentative bid schedule has not been determined. Further details regarding construction and completion timelines have not been established. Funding has not been allocated.

Design

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
185
Bidding Soon
3,690
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2026

Project location map

Multiple Locations, Highland Village, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.