EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2024 at 8:00 PM

Updated August 1, 2024

Site work and paving for a road / highway in Centennial, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000356262 Job Location: Centennial, Colorado The traffic signal construction will include all labor, equipment, and materials necessary to install a new traffic signal at the intersection of Arapahoe Rd. and Clarkson St. The project also includes intersection pavement markings and pavement markings and signage for multimodal facilities on Clarkson St. from Arapahoe Road to East Panama Drive. Question Deadline 07/15/2024 at 2:00 PM MT Questions are submitted online Yes, All questions regarding the meaning or intent of the Contract Documents shall be submitted in writing to Elizabeth Dunaway, Purchasing Manager, City of Centennial, 13133 E. Arapahoe Road, Centennial, CO 80112. Any inquiry received seven (7) or more days prior to the date fixed for the opening of Bids will be given consideration. Each Bid shall be made on the Bid Form provided in the bid packet and no Bidder may withdraw their Bid for a period of ninety (90) days from and after the date set for opening of bids. Each Bid must be accompanied, in a sealed envelope, separate from the one containing the Bid, by a Bid Bond on an approved form in an amount equal to ten percent (10%) of the Bid price, made payable to the City of Centennial, which shall be considered as liquidated damages and shall be forfeited to the City if said Bid is accepted and the Bidder fails to execute the Contract within ten (10) calendar days after the Award by the City. The successful Bidder will be required to furnish, as part of the Contract, insurance certificates in the amount specified in the General Conditions, a Performance, Payment, and Maintenance Bond in an amount equal to onehundred percent (100%) of the Contract Sum, said bond to be issued by a responsible corporate surety approved by the City, and which shall guarantee the faithful performance of the Construction Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all materials and labor, and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor. The City reserves the right to waive informalities or irregularities and to reject any or all Bids. Capitalized terms not defined in the Instructions to Bidders have the meaning assigned in the General Conditions.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

55

10

2

4

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Glazing, Glass Glazing
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Static Uninterruptible Power Supply
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Dewatering
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Watering, Irrigation, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
48
Bidding Soon
957
All Active Projects
373
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2024

August 31, 2024

img_map_placeholder

S Clarkson St & E Arapahoe Rd, Centennial, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.