BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 10, 2025

Site work for a road / highway in Pearland, Texas. Completed plans call for site work for a road / highway.

As of June 06, 2025 this project has not yet been awarded. A timeline for the award has not yet been established. The design of a new 2.64-mile fiber optic connection between Citys existing network connection at the Cullen Parkway and Magnolia Parkway intersection traffic controller cabinet and extending the fiber network along Magnolia Parkway to the Magnolia Parkway / Business Center Drive intersection traffic controller cabinet. This project will add five traffic signal controllers along Magnolia Parkway to the City's fiber optic network are: o CR 89 (Cullen Parkway) at Magnolia Parkway (network connection point) o Morgan Road at Magnolia Parkway o CR 90 at Magnolia Parkway o Smith Ranch Road at Magnolia Parkway o Business Center Drive at Magnolia Parkway Questions regarding electronic bidding should be directed to City Purchasing Officer at purchasing@pearlandtx.gov. The fiber backbone will connect to the fiber network at the Cullen/Magnolia traffic signal controller cabinet. The fiber run will traverse east to west on the south side of Magnolia from the Cullen Parkway / Magnolia Parkway intersection until the CR 90 / Magnolia Parkway intersection where the fiber conduit will cross beneath Magnolia Parkway from the southwestern corner to the northwestern corner then connect to the CR 90 / Magnolia Parkway controller cabinet on the northwestern corner. After the CR 90 / Magnolia Parkway traffic controller cabinet, the fiber backbone will traverse east to west along the north side of Magnolia Parkway until it reaches Business Center Drive and its respective traffic signal controller cabinet. The fiber optic connection will carry 96-strand and a 12-strand single mode fiber the entire project length of approximately 13,932 feet. Question Deadline 04/03/2025

Bid Results

Roads / Highways

$407,180.00

Public - City

Site Work

65

21

2

2

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
359
Active Projects
180
Bidding Soon
3,383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 12, 2025

Project location map

Magnolia Pkwy, Pearland, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.