Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 15, 2024 at 8:00 PM
Updated August 16, 2024
Renovation of a fitness / recreation center in Marquand, Missouri. Completed plans call for the renovation of a fitness / recreation center.
The Exterior of the Building Can Be Viewed at Any Time. Mr. Kenny Whitener, Maintenance Director, Will Hold a Tour and Q/a From 10 - Noon on July 11, 2024. Question Deadline 07/11/2024 at 10:00 AM CT Mr. Kenny Whitener, Maintenance Director, will hold a tour and Q/A from The Board of Education Reserves the Right to Reject Any Bids. Remove and replace any rotten facia boards Replace the guttering with new troughs that match the existing guttering Replace the downspouts with new heavy-duty white 4" spouts. The Northside spouts will be connected to the existing drain piping. The Southside spouts will be replaced with a 45-degree elbow to stop the water from running down the wall. Door and Porch Widen the porch railing by removing it and attaching it to the exterior side, allowing for the new door to fully swing open. Install a new 36" metal exterior door and frame with a panic bar. The door must swing outside. North Door Install a new 36" metal exterior door and frame with a panic bar installed. The door must swing outside. Roof Remove the metal cap of the concrete coping stone on both ends of the building. Replace the cap with new metal that completely covers the full width of the coping stone. The metal needs a drip edge and the front and back edge cleat anchored at the bottom on both ends of the building. Exterior Walls Powerwash and clean the exterior of the building Remove all showing tar on the exterior of the wall. Cut around the sides and tops of the columns and replace them with caulk Cut around the sides, top, and bottom of the windows and replace them with caulk Cut out the riglet joints where the buildings connect and replace them with caulk Up to 30% cut out and tuck point to match the existing bead roping Cut between the rock and footing then replace with caulk. Rewash and spray the exterior rock with a high-quality sealant to waterproof them. Exhaust Fans Replace the 2 large exhaust fans and 2 sets of louvers in the gymnasium Replace the 2 small basement exhaust fans and louvers in the basement Paint Paint the columns white on both sides of the gym Paint the blocked-in windows with white paint.
Award
Fitness / Rec Centers
$237,160.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 25, 2024
August 26, 2024
205 Morley St, Marquand, MO
Related To This Project
Marquand, MO
Bid Date: Jun 23 2025
Marquand, MO
Bid Date: Sep 08 2025
Marquand, MO
Bid Date: May 17 2023
Kansas City, MO
--
Platte City, MO
Bid Date: Jul 12 2024
Kansas City, MO
Bid Date: Sep 04 2024
Greentop, MO
Bid Date: Jul 08 2024
Kirksville, MO
Bid Date: Jul 10 2024
Des Peres, MO
Bid Date: Aug 16 2024
Webb City, MO
--
Platte City, MO
Bid Date: Jul 18 2024
Brentwood, MO
Bid Date: Apr 12 2019
Brentwood, MO
--
Saint Peters, MO
Bid Date: Dec 10 2020
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
