BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2024 at 8:00 PM

Updated August 8, 2024

Site work and new construction of a warehouse / distribution facility in Atmore, Alabama. Completed plans call for the construction of a 9,000-square-foot warehouse / distribution facility; and for site work for a warehouse / distribution facility.

EMS Warehouse for the Poarch Band of Creek Indians Project Description: Construction of approximately 9,000 SF of warehouse space and associated site work. TWO-HUNDRED SEVENTY(270) working days are allowed for the construction of the project. A cashier's check drawn on an Alabama bank or a bidder's bond, payable to Poarch Band of Creek Indians for an amount not less than five percent (5%)of the amount bid, but in no event more than fifty thousand dollars ($50,000.00) in accordance with Alabama bid law, shall be filed with the bid, as a bid guaranty. The bidder's bond shall be prepared on the form specified and issued by a surety company authorized to do business in the State of Alabama. A performance bond in the form and terms approved by the Poarch Band of Creek Indians in an amount not less than the contract price will be required at the signing of the contract. A labor and materials bond in the form and terms approved by the Poarch Band of Creek Indians in an amount not less than the contract price, insuring payment for all labor and materials, shall also be required at the signing of the contract. In addition, the contractor must furnish to the Poach Band of Creek Indians at the time of the signing of the contract a certificate of insurance coverage as provided in the specifications. The right is reserved to reject any and/or all bids and to waive informalities and to furnish. Liquidated damages for noncompletion of the work within the time limit agreed upon will be assessed in accordance with the terms of the contract. Allquestions or clarifications mustbe sent by email to mrogers@ thompsonengineering.comno later than Friday, July 26,2024, at 12:00 PM local time. If an addendum is necessaryThompson Engineering will issue one to the email addressesthat we have on file. No bids will be considered unless the bidder, whether residentor non resident of Alabama, isproperly licensed and qualifiedto perform the work describedherein in accordance with allapplicable laws of the State ofAlabama at the time of the prebid. No bid shall be withdrawn fora period of ninety (90) days subsequent to the opening of bids without the consent of the Poarch Band of Creek Indians. Minority and women's business enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities and equipment, material and/or supply needs. The right to reject any or all bidsand to disregard any minor irregularities is reserved by theowner.

Post-Bid

Warehouse / Distribution

$1,000,000.00

Public - Federal

New Construction, Site Work

72

49

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
74
Bidding Soon
731
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2024

October 7, 2024

Project location map

466 Martin Rd, Atmore, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.