BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a laboratory facility in Placerville, California. Completed plans call for the renovation of a laboratory facility.

Award Details Contract Award Date: Aug 08, 2024 Contract Award Number: 127EAW24C0032 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: CLCJWLABTYB9 Contractor Awarded Name: HAN AARON Contractor Awarded Address: Fallbrook, CA 92028 USA Base and All Options Value (Total Contract Value): $15,877.88 127EAW24R0055 - Placerville Subpanel Replacement - A00001 This purpose of this amendment is to disseminate FS led site visit information. An organized site visit will be held on Wednesday July 17th, 2024, 11:00 AM PST. See page 2 for full details. In no event shall failure to inspect the site constitute grounds for a claim after contract award. PLEASE RSVP TO THE SITE VISIT BY EMAILING: GREGORY.CUNNINGHAM@USDA.GOV /////////////////////////////////////////////////////////////////////////////////////////////////////////////// 127EAW24R0055 - Placerville Subpanel Replacement El Dorado National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $25,000 and $100,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, July 19th, 2024. An organized site visit will be held between 9-12 July. Full site visit information will be posted via amendment when available. The site is not publicly accsesible and the only time to physically view the project will be when site visit information is disseminated. PROJECT LOCATON Pacific Southwest Research Station- Institute of Forest Genetics 2480 Carson Road Placerville CA, 95667 The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 14 Calander days after NTP issuance. The time stated for completion shall include final cleanup of the premises. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Laboratories

$15,878.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
69
Bidding Soon
1,033
All Active Projects
393
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

August 30, 2024

img_map_placeholder

2480 Carson Rd, Placerville, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.