BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in David City, Nebraska. Conceptual plans call for site work for a transportation facility; and for paving for a transportation facility.

The City of David City (Sponsor) is hereby soliciting Statement of Qualifications from consultants for airfield development projects that are anticipated to occur within the next five Federal fiscal years 2025 to 2029 at the David City Municipal Airport (93Y) located near David City, Nebraska. Subject to receipt of Federal funding and/or State funding, these projects may include the following: 1. FY2025 Rehabilitate/Reconstruct Runway 14/32 Estimated Construction Cost $3,672,000. These projects have been developed from the Sponsor s Airport Capital Improvement Plan (CIP), prepared with assistance from the NDOT Division of Aeronautics. A copy of each project CIP Data Sheet will be made available upon request. The services to be provided may include, but are not limited to, preliminary design, final design, bidding, construction observation, and incidental special services such as geotechnical/subsurface investigations and topographic surveying. Federal Provisions for Solicitations Civil Rights Title VI (49 USC 47123 and FAA Order 1400.11). The Sponsor, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all consultants that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this notice/solicitation/invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The following seven Federal provisions are incorporated into this Notice by reference: Buy American Preference (Title 49 USC 50101) Davis-Bacon Requirements (2 CFR 200, Appendix II(D) and 29 CFR Part 5) Debarment and Suspension (2 CFR Part 180 (Subpart C), 2 CFR Part 1200, and DOT Order 4200.5) Disadvantaged Business Enterprise (49 CFR Part 26) Foreign Trade Restriction (49 USC 50104 and 49 CFR Part 30) Lobbying and Influencing Federal Employees (31 USC 1352 Byrd Anti-Lobbying Amendment; 2 CFR Part 200, Appendix II(J); and 49 CFR Part 20, Appendix A) Procurement of Recovered Materials (2 CFR 200.322, 40 CFR Part 247, and Solid Waste Disposal Act) Selection Criteria In selecting a consultant, the Sponsor is using a qualifications-based selection process conforming to FAA Advisory Circular 150/5100-14E Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects. As such, fee information will not be considered in the selection process and shall not be submitted with the Statement. Fees will be negotiated for projects as federal funds become available. The agreement(s) between the Sponsor and the selected consultant will be subject to Federal Contract Provisions for A/E Agreements. The Sponsor intends to select the most qualified firm directly from submittals but reserves the option to short list up to three (3) of the highest rated firms and perform phone, informal, and/or formal interviews. Consultants will be rated by a selection committee according to the following selection criteria and the weight given to each: 1. Capability to perform all aspects of the projects (15%) qualifications of prime firm (and subconsultants, if any); 2. Relevant experience of key personnel from prime firm (and subconsultants, if any) and role (17%); 3. Knowledge of FAA standards, policies, and procedures (20%); 4. Recent experience with comparable projects at similarly sized airports (14%); 5. History of meeting schedules and staying within budget (14%); and 6. Understanding of the project s potential challenges and Sponsor s concerns (20%). Submittal Requirements Statements must be concise and contain no more than twenty-eight (28) pages of material (14 sheets of paper, double sided). This excludes the front and back covers, the two-page cover letter (1 sheet of paper, double sided), table of contents, section dividers, and resumes. Consultants shall submit five (5) hard copies of their Statement in a package marked Airport Statement of Qualifications in the lower left hand corner and the sender s name and address in the upper left hand corner. In addition to the hard copy(s), the Consultant must submit a PDF of their Statement by the same via email with the subject line Airport Statement of Qualifications and request delivery/read receipts to confirm receipt. The Sponsor reserves the right to reject any and/or all Statements. Statements once submitted become property of the Sponsor. Inquiries All questions must be submitted via email to the above contact by 5:00 p.m. on July 3, 2024. (Two weeks before submittal deadline.) Answers will be sent via reply email no later than 5:00 p.m. on July 10, 2024. (One week before submittal deadline.)

Conceptual

Transportation Terminals

$3,672,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
70
Bidding Soon
853
All Active Projects
379
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 18, 2025

img_map_placeholder

M Rd, David City, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.