BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 27, 2024 at 8:00 PM

Updated November 28, 2024

Site work for a civil project in Palo Alto, California. Completed plans call for site work for a road / highway.

The City reserves the right to issue an addendum or addenda per the "Addenda" section of these Instructions to Bidders within this IFB. The City will verify the status of the contractors license by checking the Contractor State License Board (www.cslb.ca.gov). The contractors license and business must match. This verification includes information on any outstanding Board disciplinary action pending against the contractor. This Project is subject to prevailing wages and related requirements as a public works under California Labor Code Sections 1720 et seq. and related regulations. Contractor is required to pay general prevailing wages as defined in California Labor Code Section 1773.1 and Subchapter 3, Title 8 of the California Code of Regulations Section 16000 et seq The intent of this project is to a) upgrade aging infrastructure related to traffic signal operations including traffic signal cabinets, video detection systems, and accessible pedestrian signal (APS) pushbuttons, b) to implement an automated traffic signal performance measurement (ATSPM) system to monitor and optimize operations on an ongoing basis, and c) [TO BE DONE BY OTHERS] develop and implement an optimized time of day coordinated signal timing plan Question Deadline 07/11/2024 at 3:00 PM PT City's Responses to Questions:July 18, 2024 It is anticipated that Work on the Project will be required to commence on or about 09/01/2024. The anticipated time of completion is no later than 09/01/2025.

Award

Roads / Highways

$453,300.00

Public - City

Site Work

14

14

4

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
243
Bidding Soon
2,444
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2024

September 1, 2024

Project location map

Quarry Rd, Palo Alto, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.