BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Santa Ana, California. Completed plans call for site work for a road / highway.

**As of August 27, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Scope of work includes installation of traffic signal poles, conduit, wiring, fiber optic cable, video detection system, emergency vehicle preemption system, and signing & striping. Bid Proposal Guaranty shall be in the form of a cashier's or certified check payable to the City of Santa Ana, or Bid Bond issued by a corporate surety, in an amount not less than ten percent (10%) of the bid aggregate, as a guarantee that the Bidder will enter into the proposed contract if the same is awarded. The signature of the bidder on the bid bond must be notarized. Liquidated Damages 3,500 Per Calendar Day Estimated Bid Value $645,000 Start/Delivery Date October 2024 to January 2025 Project Duration 60 Working Days Online Q&A Yes Q&A Deadline 07/10/2024 2:00 PM (PDT) From the time of City Council contract award until work completion, the Contractor shall possess a valid California Class "C-10" Contractor's license. All sub-contractors shall be properly licensed for their respective trades. The City Council reserves the right to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a notice to proceed with the project notwithstanding any pending or continuing challenge to its determination. This work consists of traffic signal installation or modifications and any other related work required to provide the intended operation at the locations shown on the project plans. This work shall be in accordance with the Plans, these Special Provisions, the Standard Specifications for Public Works Construction (SSPWC), Section 86 and 87 of the 2023 Caltrans Standard Specifications, the 2023 Caltrans Standard Plans, and any applicable errata (or Revised Standard Plans). The Caltrans Standard Specifications Section 86 and 87 set forth above will control the construction materials, and construction methods for specific work relating to Street Lighting, Traffic Signal Materials and Traffic Signal Systems, except as amended by the Project Plans and these Special Provisions.

Bid Results

Roads / Highways

$642,678.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
107
Bidding Soon
2,436
All Active Projects
1,002
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2024

October 7, 2024

img_map_placeholder

W Segerstrom Ave & S Spruce St, Santa Ana, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.