BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a water / sewer project in Kansas City, Missouri. Conceptual plans call for the renovation of a water / sewer project.

The City of Kansas City, Missouri ("City") invites you to submit a proposal for Turkey Creek PS Rehabilitation. Submissions and Questions. Proposers shall submit their Proposal and any questions or issues about any aspect of this RFQ/P to the following City Contact person: Delois Moore, Procurement Manager Kansas City Water Department 4800 E. 63rd Street, Kansas City, MO 64130 Office : (816) 513-0358 E-mail : delois.moore@kcmo.org. (b) Question Deadline (July 29, 2024, at 2 PM) Proposers may submit written questions, request clarifications, or provide notice to the City of any ambiguities, conflicts, mistakes, errors or discrepancies that Proposer has discovered in the RFQ/P, the Standard City Contract, Scope of Services and any other solicitation document at any time until ten (10) days prior to the due date for proposals. The City reserves the unconditional right to reject any or all proposals received in response to this RFQ/P at any time prior to the City executing a contract that meets the requirements of Section 432.070, RSMo, the City Charter and all applicable City Ordinances. The Water Services Department wishes to contract with a Design Professional (DP) to provide preliminary design services for the rehabilitation of Turkey Creek Pump Station. This Project will comprise of: 1. Project management and management of subcontractors in relation to the work specified herein. 2. Review the 2023/2024 Water Master Plan's projected supply demands as it becomes available. 3. Review of previous reports, the Water Master Plan (2017), operations data, "Turkey Creek Pump Station Electrical Evaluation", "Pump Station Physical Condition Assessment" (BV 2014), and as-builts made available to the DP. 4. Condition assessments within the existing Turkey Creek Pump Station. 5. Lidar scanning of the facility and BIM model creation. 6. SKM modeling. 7. Updates to/creation of process and equipment PFD's and piping and instrumentation diagrams (P&ID's). 8. Engineering Report with findings from all analyses and identification of design/construction packages to meet CIP funding requirements. 9. Computational Fluid Dynamics (CFD) to support Hydraulic Models 10. DP shall prepare a recommendation for phasing for proposed work and recommendation on delivery methods based on constructability, risk, funding, uncertainty of projects, and other recommended factors. 11. DP shall use e-builder document management system. 12. DP shall use a cost loaded scheduling system such as Microsoft Project or P6. 13. DP shall provide an S curve with all invoices. 14. DP shall submit meeting agendas and expected DP attendees at least 3 days prior to each meeting and distribute draft meeting minutes within one business day of the meeting. 15. Any I&C work will be performed per KC Water I&C standards.

Conceptual

Water / Sewer

$500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
38
Bidding Soon
719
All Active Projects
278
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2025

img_map_placeholder

2401 Allen Terrace, Kansas City, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.