Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Baxter, Minnesota. Completed plans call for site work for a water / sewer project.
construction of the 2024 CSAH 77 Utility Improvements Project The proposed work includes, but is not limited to the following major quantities: 1.1 Acre Clearing & Grubbing 1 Lump Sum Dewatering 60 Cu Yd Aggregate Base Class 5 85 Ton Bituminous Mixture 1 Each Connect to Existing Sanitary Manhole 840 Lin Ft Clean and Video Tape Pipe Sewer 840 Lin Ft 6", 8" and 10" PVC Sanitary Sewer 820 Lin Ft 6" Forcemain 4 Each Hydrants 6 Each 6" and 8" Gate Valves 1 Each 12" Wet Tap 1645 Lin Ft 6", 8" and 12" PVC Watermain 4 Each Construction Drainage Structure Design 4007 1 Lump Sum Traffic Control 1800 Lin Ft Silt Fence 740 Cu Yd Topsoil Borrow 1.75 Acre Seeding 6825 Pound Hydraulic Mulch Matrix 250 Lin Ft Pavement Markings Document info : Please make your check payable to CES Imaging and send it to 1701 James Circle N, Brooklyn Center, MN 55430. Please contact CES Imaging Repro Dept at (763) 560-9098 or (800) 831-8587 for pricing and if you have any questions. The Owner reserves the right to waive any informality or to reject any or all bids. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. Each bid shall be accompanied by a Bid Bond in an amount equal to 5% of the total amount of the bid made payable without condition to the Owner, as a guarantee that the Bidder, if awarded the Contract, will promptly execute the Agreement in accordance with the Bid and the other Contract Documents. Question Deadline 07/04/2024 Bidder shal submit al questions about the meaning or intentof the Bidding Documents to Enginer inwriting. Contact information and submittal procedure sf or such questions are as follows: A. Aric Welch, Project Engineer 1. Office Phone: 218-316-3645 2. Email: aric.welch@widseth.com 3. Office Addres: Wi dseth Smith Noltingand Associates Inc., 7804Industrial Park Road, Baxter, MN 56425
Award
Water / Sewer
$551,053.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2024
September 14, 2024
Multiple Locations, Baxter, MN
Related To This Project
Baxter, MN
Bid Date: May 15 2024
Baxter, MN
Bid Date: Jun 11 2019
Baxter, MN
Bid Date: Apr 11 2024
Baxter, MN
Bid Date: Mar 19 2024
Baxter, MN
Bid Date: Jul 13 2021
Baxter, MN
Bid Date: Feb 13 2024
Baxter, MN
--
Baxter, MN
Bid Date: Feb 13 2024
Baxter, MN
Bid Date: Oct 09 2023
Baxter, MN
Bid Date: Jan 20 2022
Baxter, MN
Bid Date: Feb 15 2022
Baxter, MN
Bid Date: Aug 02 2023
Baxter, MN
--
Baxter, MN
Bid Date: Jul 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.