BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2024 at 8:00 PM

Updated August 15, 2024

Renovation of a municipal facility in Sacramento, California. Completed plans call for the renovation of a 2,140-square-foot municipal facility.

Contractor shall provide all materials, labor, equipment, tools, permits, taxes, transportation, and prepare surface for installation of 2,140 square feet (sq ft) of new commercial grade Luxury Vinyl Plant (VLP) and 356 foot (ft) of 6 inch (in) commercial grade vinyl baseboard for Fresno-Kings Unit Tollhouse Fire Center (FKU). All materials shall be approved by the CAL FIRE Project Manager prior to installation delivery, set up, installations, disassembling, and disposal is included. The DVBE Participation Program applies, and a three percent (3%) goal is required for this IFB. The DVBE Incentive Program may also apply to this IFB. See Section D, Special Programs, Item 1, in this IFB for requirements. As required by Executive Order S-02-06, the California Department of Forestry and Fire Protection (CAL FIRE) is committed to meeting the State's 25 percent (25%) Small Business (SB) participation goal. Certified SBs, Micro Businesses (MB), and contractors willing to commit to subcontracting a minimum of 25 percent (25%) of their net bid price to certified SBs or MBs (if applicable);are encouraged to submit bids. See Section D, Special Programs, Item 2, in this IFB for requirements. This contract requires Prevailing Wages if the total bid amount exceeds $1,000.00. If the total bid amount is under $1,000.00, then Prevailing Wage language will be removed prior to award. Refer to Sample Standard Agreement, for requirement details Payment Bond (STD 807) Requirement: If the successful bidder's bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement The State reserves its right to seek any and all relief it may be entitled to as a result of such non-disclosure. Question Deadline 07/05/2024 at 5:00 PM PT In the opinion of California Department of Forestry and Fire Protection (CAL FIRE), this IFB is complete and without need of explanation. However, if you have questions, or should you need any clarifying information, the contact person for this IFB is: Gilbert Delpasen California Department of Forestry and Fire Protection (916) 894-9833 Gilbert.delpasen@fire.ca.gov Please note that no verbal information given will be binding upon the State unless such information is issued in writing as an office *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Bid Results

Municipal

$25,850.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
233
Bidding Soon
2,537
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2024

August 14, 2024

Project location map

To Be Determined, Sacramento, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.