BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2024 at 8:00 PM

Updated July 10, 2024

Site work and paving for a road / highway in Phoenix, Arizona. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The City of Phoenix is seeking a qualified consultant to provide engineering services for the 3rd Street: Rio Salado to Jefferson Street Connector project. Services will include evaluating the existing preliminary engineering study and providing design services up to 30% design submittal. There will be an option to extend the contract to complete full design services. The project limits are from the north bank of the Rio Salado multi-use path into downtown Phoenix at the intersection of 3rd Street and Jefferson Street. The estimated construction cost is $15.5 million. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$15,500,000.00

Public - City

Paving, Site Work

16

10

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2025

Project location map

3rd St., Phoenix, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.