Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 13, 2024 at 8:00 PM
Updated August 14, 2024
Site work and paving for a mixed-use development in Silver City, New Mexico. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The Project includes, but is not limited to, the following Work: Reconstruction of approximately one half mile of Little Walnut Road, from north of Chavez Lane to south of Jack Frost Road, to include paving, curb and gutter, a 5 ft. sidewalk, drivepads, drainage improvements, signage, and striping, and bike lanes. The Project has an expected duration of (160) calendar days to substantial completion. Electronic copies of Bidding Documents and plans may be requested from Stantec. Prospective Bidders are urged to register with Stantec as a plan holder, even if Bidding Documents are obtained from a plan room or source other than Stantec in either electronic or paper format. Stantec will update periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through Stantec. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than Stantec. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 07/11/2024 All questions about the meaning or intent of these documents shall be submitted only to the Engineer of Record, stated above, in writing, questions will be accepted 72 hours prior to the time ofthe Bid Opening. Submit all the questions to Engineers of Record c/o Stantec, Deanna Mascarenas, Project Coordinator, deanna.mascarenas@stantec.com
Award
Roads / Highways
$2,972,987.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 16, 2024
September 16, 2024
Little Walnut Rd, Silver City, NM
Related To This Project
Silver City, NM
Bid Date: Jul 31 2024
Silver City, NM
Bid Date: Aug 12 2024
Silver City, NM
Bid Date: Aug 05 2024
Silver City, NM
--
Silver City, NM
--
Silver City, NM
--
Silver City, NM
Bid Date: Apr 15 2025
Silver City, NM
Bid Date: Mar 24 2025
Silver City, NM
Bid Date: Jul 12 2024
Silver City, NM
--
Silver City, NM
Bid Date: Nov 15 2024
Silver City, NM
--
Silver City, NM
--
Silver City, NM
--
Silver City, NM
Bid Date: Nov 14 2023
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
