Site work for a water / sewer project in Nipomo, California. Completed plans call for site work for a water / sewer project.

The work involves construction of three water system interconnections consisting of a precast concrete vault, flow control valve, flowmeter, piping, valves, electrical and instrumentation, and communication systems. The District will furnish the electrical control panels, flow meters, and globe flow control valves for installation by the contractor. COMPLETION OF WORK: The WORK must be completed within 150 successive calendar days after the commencement date stated in the Notice to Proceed. DESCRIPTION OF WORK: The work involves construction of three water system interconnections consisting of a precast concrete vault, flow control valve, flowmeter, piping, valves, electrical and instrumentation, and communication systems. The District will furnish the electrical control panels, flow meters, and globe flow control valves for installation by the contractor. The project location includes the following sites: Nipomo Community Services District - Golden State Water Company Cypress Ridge Interconnection (GSWCCR), 1788 Lyn Road, Nipomo, California Nipomo Community Services District - Golden State Water Company Interconnection (GSWC), Primavera Lane at Orchard Road, Nipomo, California Nipomo Community Services District - Woodlands Mutual Water Company Interconnection (WMWC), 1591 Camino Caballo, Nipomo, California. CONTRACTOR'S LICENSE CLASSIFICATION: In accordance with the provisions of California Public Contract Code Section 3300, the OWNER has determined that the CONTRACTOR shall possess a valid Class "A" General Engineering contractor's license issued by the State of California, Contractors State License Board, at the time that bids are submitted. In addition, CONTRACTOR shall also maintain local business license issued by the County of San Luis Obispo. Failure to possess the specified licenses shall render the Bid non-responsive and shall bar award of the Contract to any bidder not possessing the licenses at the bids are submitted. BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of ninety (90) calendar days from the date of bid opening. BASIS OF AWARD: The OWNER will award the contract, if at all, to the responsible contractor that submits the lowest base bid. Each Bid shall be accompanied by a certified or cashier's check or Bid Bond in the amount of ten (10) percent of the Total Bid Price payable to the Nipomo Community Services District as a guarantee that the Bidder, if its Bid is accepted, will promptly execute the Agreement and provide all required bonds and insurance. A bid shall not be considered unless one of the forms of Bidder's security is enclosed with it. The successful bidder will be required to furnish OWNER with Payment and Performance Bonds equal to one hundred (100) percent of the Contract Price. Bonds shall be on the forms included in the Contract Documents; OWNER will not accept bonds on any other form. Liquidated damages shall accrue in the amount of $1,000 for each calendar day that WORK remains incomplete beyond the Project completion deadline specified in the Contract Documents. The OWNER reserves the right to reject any or all bids, to waive any informality in a bid, and to make award, if any, to the lowest responsive, responsible bidder as it may best serve the interest of the OWNER. All communications relative to this WORK shall be directed to the DESIGN ENGINEER no later than 4:30 p.m. on July 15, 2024. MKN & Associates, Inc. 530B Paulding Circle Arroyo Grande, CA 93420 Telephone: (805) 904-6530 Attention: Mike Nunley Email: mnunley@mknassociates.us ***Document Note: Hard copies of the Contract Documents can be purchased by registered plan holders directly from ASAP Reprographics located at 365 Quintana Road, Morro Bay, CA 93442. ***Prebid meeting: Detailed technical questions may be submitted in writing but they will be answered, if warranted, by addenda later. Oral statements may not be relied upon and will not be binding or legally effective. Attendance at the pre-bid conference and site visit is mandatory and failure to attend the pre-bid conference and site visit will result in your bid being rejected as non-responsive.

Award

Water / Sewer

$1,195,200.00

Public - City

Site Work

32

20

2

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
11
Bidding Soon
252
All Active Projects
107
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

August 26, 2024

img_map_placeholder

Multiple Locations, Nipomo, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.