BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2024 at 8:00 PM

Updated September 24, 2024

Demolition, site work, paving and new construction of a civil project in Madison, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Construction Plan for: Bridge Replacement over West Fork Lac qui Parle River (BR. 5682 OLD) (BR. 37560 NEW), Approach Grading, and Aggregate Surfacing. The major items of work are: Bridge Slab Concrete (3YHPC-M): 3,502 SF, Structural Concrete (3B52): 97 CY, Reinforcement Bars (Epoxy Coated): 59,320 Pounds Read carefully the Wage Scales as they affect this project. Minimum wage rates to be paid by the contractor(s) have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581. Those which apply to this project are set forth in the proposal for this project. Plans and Proposals may be inspected at the office of the Lac qui Parle County Highway Engineer, 422 5th Avenue, Suite 301, Madison, MN 56256. Each bid must be accompanied by a certified check or bidders bond made payable to Lac qui Parle County in a sum not less than 5% of the bid. The County reserves the right to reject any and all bids, to wave any informalities therein and to accept the bid deemed most advantageous to the County. Project Start Date:08/06/2024 Construction Start Date:08/06/2024 Construction End Date:08/01/2025

Award

Bridges / Tunnels

$744,706.00

Public - County

Demolition, New Construction, Paving, Site Work

53

8

2

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
19
Bidding Soon
240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

August 6, 2024

Project location map

1191st Ave over W. Fork Lac Qui Parie River, Madison, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.