BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2024 at 8:00 PM

Updated January 4, 2025

Site work and paving for a mixed-use development in Frontenac, Missouri. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and water / sewer project.

The proposed scope of work includes cold milling and resurfacing the roadway, installing new concrete curb and gutter, new concrete sidewalk including ADA compliant curb ramps, storm sewer, landscaping, pavement markings, traffic signal modifications, and other appurtenances from north of Hermitage Hill Road to Clayton Road and new sidewalk and curb and gutter along Clayton Road from Geyer Road to just west of Spoede Road. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the current version of the Missouri Standard Specifications for Highway Construction including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. A certified cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The City of Frontenac reserves the right to reject any or all bids. The project will be awarded to the lowest, responsive, responsible bidder. The DBE Goal for this project is 10%. No 2nd tier subcontracting will be allowed on this project MODOT - Geyer Road - Phase I Road Improvements Project no-6899-20, 23MSD-00342 All questions concerning the bid document preparation can be directed in writing to Lorne Jackson, PE, Lochmuelle

Award

Roads / Highways

$2,313,168.00

Public - City

Paving, Site Work

149

8

9

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
92
Bidding Soon
1,237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

September 2, 2024

Project location map

N Geyer Rd, Frontenac, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.