BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Crystal River, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

All work for the Project shall be constructed in accordance with the Drawings and Specifications prepared by the Engineer. Bids shall be submitted for furnishing, delivering and installing all materials, equipment and services, including labor for the Work, which generally involves the following activities: The construction of a sidewalk connecting LaGrone Park and Copeland Park, with approximately 200 LF of 8' wide 4" sidewalk and 1000 LF of 5' wide 4" sidewalk. Removing and replacing a stormwater flume along SE 8th Avenue. Removing the existing guardrail at the intersection of SE 8th Avenue and NE 1st Terrace. Removing and replacing a mitered end section at the intersection of SE 8th Avenue and NE 1st Terrace to extend culvert. The installation of landings, crosswalks, and a handrail per FDOT design standards. All qualified contractors licensed by the State of Florida are hereby invited to submit a bid on the above referenced project. The last day for questions is 5:00 PM E.T on July 29th, 2024 For more information, contact Stacy Boney, Kimley-Horn and Associates at (352) 438-3000. CONTRACT TIME: Construction time to achieve Substantial Completion is 90 consecutive calendar days from the date of the Notice to Proceed, with an additional 30 consecutive calendar days to achieve Final Completion. BID SECURITY: A 5% bid security will be required for this project. PERFORMANCE AND PAYMENT BOND: The Owner will require that the Contractor furnish a Performance and Payment Bond in an amount equal to 100% of the Contract Price. All Payment and Performance Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida. The City of Crystal River reserves the right to waive formalities, waive any technical defects, reject any and all bids, and accept any bid which represents the lowest and best offer to the City.

Award

Sidewalks / Parking Lot

$147,388.00

Public - City

Paving, Site Work

7

12

11

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
38
Bidding Soon
943
All Active Projects
413
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2024

October 14, 2024

img_map_placeholder

SE 8th Ave, Crystal River, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.