Published August 6, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Brigantine, New Jersey. Completed plans call for the renovation of a municipal facility.

Emergency Generators at Various Locations Six (6) natural gas emergency generators ranging in size between 60KW and 250KW and automatic transfer switches, six (6) elevated platforms, flood gates at various locations, electrical gas connections, and other incidental construction including restoration. Failure to follow this procedure for registration and receipt of documentation in submitting a bid will result in the bid being deemed incomplete and therefore will be rejected. Bidders are required to comply with the requirements of the Local Public Contracts Law, the Prevailing Wage Act, the requirements of P. L. 1975, c.127, and N.J.S.A. 10:5-31et seq. and N.JA.C. 17:27-1.1 et seq., Affirmative Action, and all requirements as set forth in the Instructions to Bidders. At the time a bid is submitted, the bidder shall submit a copy of its Business Registration Certificate. Bids must be made on standard proposal forms, in the manner designated and must be received in sealed opaque envelopes, bearing the name and address of the bidder and the name of the project on the outside, addressed to the City Clerk, City of Brigantine and must be accompanied by a Non-Collusion Affidavit and a bid bond or certified check for not less than ten percent (10%) of the amount of the bid, providing that said check or bid bond need not be more than $20,000.00 nor shall not be less than $500.00, and be delivered at the place and on or before the hour named above. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27-1 et seq. **Document Notes: In order to assure that all potential bidders receive the complete bid documentation, as well as any amendments, modifications, or supplements thereto, bid documentation must be obtained only from the office of Roberts Engineering Group, LLC, 1670 Whitehorse Hamilton Square Road, Hamilton, New Jersey 08690 by registering with the Engineer and paying the required documentation fee of $95.00. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Municipal

$2,678,012.00

Public - City

Renovation

14

9

10

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings, Metal Gratings
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceramic Tiling, Quarry Tiling, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
85
Bidding Soon
1,492
All Active Projects
716
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2024

September 2, 2024

img_map_placeholder

To Be Determined, Brigantine, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Emergency Generators at Various Locations

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.