BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2025 at 7:00 PM

Updated January 31, 2025

Site work and new construction of a mixed-use development in Kissimmee, Florida. Completed plans call for the construction of a recreation facility; for site work for a recreation facility; 32,194-square-foot clubhouse / community center; and clubhouse / community center.

As of January 30, 2025, this project has not been awarded. New Amenity Building. "The Hub" is a 32,194 sf building with a Grand Lobby, Rock Climbing Wall, Gathering Room, Fitness Center, Weight Room, Movement Studio, Kids Play Room, Flex Room, Laundry Room, Restrooms, Locker Rooms, Cafe, & Basketball Court. The Westview Community is a 3,580 home neighborhood located at Cypress Parkway and Lassiter Way in Poinciana Florida. Assumptions: 1. We assume site development will be by Taylor Morrison under a separate contract. 2. We assume we are building on pad ready compacted soil. 3. We assume all underground utilities will be withing 5' of the building perimeter at time of construction. 4. We assume coordination of elevations & underground utility coordination is required and included in this bid. 5. The ID drawing shall supersede any conflicts with the architectural drawings. The following trades are required (but not limited to) final cleaning, temp fencing, temp office trailer, temp storage, fall protection, dumpsters, surveying, soil poisoning, material testing, threshold & special inspections, concrete, stone veneer, masonry, structural & miscellaneous steel, bar joists, metal deck, equipment screening, decorative screen panels, rough carpentry, sheathing, joists & trusses, trim carpentry, cabinets/countertops, board & batt insulation, R-19 open cell spray-foam insulation, standing seam metal roofing, facia, flashing, & soffit, gutters & downspouts, waterproofing, joint sealants, doors & hardware, storefront/windows, acoustical ceilings & baffles, drywall & framing, stucco, stucco banding, ceilings, flooring, painting, specialties, lockers, fireplace, basketball courts, divider curtain, bleachers, scoreboards & wall padding, fire sprinklers, plumbing, HVAC & electrical, lighting controls, fire alarm.

Post-Bid

Clubhouse / Community Centers

$8,306,052.00

Public - City

New Construction, Site Work

194

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
120
Bidding Soon
2,925
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2024

October 29, 2024

Project location map

2315 Lassiter Wy, Kissimmee, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.