BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Elk Grove Village, Illinois. Completed plans call for site work for a water / sewer project.

Underground Storage Tanks (USTs) Removal - One (1) 8,000-gal tank, One (1) 6,000 gal tank and One (1) 4,000 gal tank at former Marathon Gas Station now The contractor shall complete the following scope of work in accordance with applicable, local, state, and federal regulations. Scope of work shall include obtaining permits for the excavation, removal, demolition, and destruction of the underground storage tanks (UST) listed above and described in the attached OSFM documents. Residual fuel/liquid shall be removed via a vacuum tanker truck and transported for treatment/disposal to a properly licensed off-site treatment or recycling facility. The facility is inactive, so the amount of fuel remaining in the USTs is unknown. All remaining fuel with salvage value will become the property of the selected contractor. Additionally, water in UST cavity displaying a sheen shall be removed via vacuum tanker truck if directed by the Villages Representative. The contractor shall remove any heel or residual product present in the USTs that is not pumpable and add adsorbent for disposal as solid waste. The scope of work also includes contractor removal of all associated dispenser islands, product underground piping, and vent piping associated with the USTs. The concrete covering the USTs shall be removed and properly disposed off-site under this contract. Concrete removal and disposal shall be considered incidental contract work and included in the UST removal bid item. This is a TOTAL BID payment for removal and disposal of one (1) 8,000 gallon diesel tank, one (1) 6,000 gallon gasoline tank, and one (1) 4,000 gasoline tank, and all associated dispenser piping, and transfer piping for each tank. Incidental work shall include oil dry/broom cleaning the service garage floor of oily residue and removal/disposal of small containers of oil. Vacuum out subfloor triple trap/sump. Emailed questions will be accepted until 11:00 AM on Friday July 15, 2024 to gdeigan@deiganassociates.com. Questions will be answered in the form of an addendum issued to all bidders.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
99
Bidding Soon
2,009
All Active Projects
868
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2024

July 22, 2024

img_map_placeholder

2800 E Higgins Rd, Elk Grove Village, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.