BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Cedar City, Utah. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

Qualified contractors/builders to design and construct a new stage for our annual Downtown Lighting Celebration. The right is reserved by Cedar City to reject any and all proposals. Stage Dimensions: The width of the stage must be at least 32 feet, no wider than 48 feet. The depth of the main portion of the stage should be at least 8 feet. The main portion of the stage must also be at least 3 feet high. The stage may also include custom landings to gap the stairs from the main entrance of the City Office building. Other dimensions will vary based on design. - Location: The stage will be installed on and around the stairs leading up to the main entrance of the Cedar City Offices. - Durability: The stage must be able to withstand the weight and movement of at least 25 performers dancing, jumping, and moving vigorously. Surface must be highly durable as well to accommodate a variety of set pieces, chair/table legs, tap shoes, weather, etc. - Portability: The stage must be able to be broken down and stored for use in subsequent years. 1. Design: - Develop a detailed design of the stage that meets the specified requirements. - Ensure the design complements the aesthetics of the City Offices and the surrounding area. - Include features for safety, stability, and ease of installation and breakdown. 2. Construction: - Use high-quality, durable materials that can withstand outdoor conditions. - Ensure the stage is sturdy and stable enough to support dynamic performances. 3. Installation: - Assistance with first installation. (Subsequent years, installation will be managed by the city) - Provide a detailed plan for the annual installation of the stage, including the estimated time required. - Ensure the stage can be securely installed on and around the stairs of the City Offices. 4. Breakdown and Storage: - Develop a plan for breaking down the stage for storage. - Ensure the stage components can be easily stored and are durable enough for repeated use.

Post-Bid

Municipal

$20,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
4
Bidding Soon
112
All Active Projects
39
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

November 19, 2024

img_map_placeholder

To Be Determined, Cedar City, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.