Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 3, 2024 at 8:00 PM

Updated January 14, 2025

Site work for a civil project in Edmonton, Alberta. Completed plans call for site work for a bridge / tunnel; and road / highway.

ASPHALT CONCRETE PAVEMENT (ACP) AND OTHER WORK 88:04 kilometre 0.000 to 20.070 PEACE REGION APPROXIMATE QUANTITIES: 20,000 Metre Crack Repair - Spray Patch 25,000 Tonne Asphalt Concrete Pavement - EPS Mix Type M1 (PG 52-34) 19.60 Kilometre Roadway Lines - Supplying Paint and Painting 39.40 Kilometre Milled Rumble Strip - Shoulder 19.00 Kilometre Milled Rumble Strip - Centreline Contractor to supply all materials. Question Deadline 07/29/2024 at 4:30 PM MT

Award

Roads / Highways

$2,931,297.00

Public - State/Provincial

Site Work

4

10

2

7

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
32
Bidding Soon
582
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

September 1, 2024

Project location map

Multiple Locations, Edmonton, AB

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed