BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for an industrial development in Sturgis, Michigan. Completed plans call for site work for a industrial development.

Reference Number 0000356716 Job Location: 1510 Progress St. Sturgis Mi, 49091 The Contract provides for the furnishing of all labor, equipment, and materials necessary to replace one (1) 69kV transmission line relay panel at Industrial Substation, one 69kV transmission line relay panel plus 69kV breaker replacement and 69kV line PT installation at Central Substation. Industrial Substation work must be completed during AEP Industrial Line outage scheduled for 10/28/24 - 11/15/24. Central Substation work must be completed by 02/01/25.The overall scope of this project includes replacement of one (1) 69kV transmission line relay panel (Sturgis Industrial Substation - AEP Stubey Rd Substation) at Industrial Substation, one 69kV transmission line relay panel (Sturgis Central Substation - AEP Stubey Rd Substation) plus 69kV breaker and 69kV line PT installation at Central Substation. The 69kV breaker and PT will be relocated from Ross Substation to Central Substation. Each 69kV line relay panel will include two(2) SEL-411L line protections relays, breaker controls, revenue meter, test switches, terminal blocks and wiring. Fiberoptic cable will be extended into each substation from AEP's splice point outside each substation into the control house. The Owner will furnish certain material as listed in the Project Manual to the Contractor. The Contractor will be requiredto pickup and transport all material which is supplied from the Owner's warehouse. Control panels are scheduled for delivery to the Owner by the end of September 2024 Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required - License Required Bonding Requirements - Bid Bond 10 % The Owner reserves the right to reject any or all bids and to waive irregularities therein, and all bidders must agree that such rejection shall be without liability on the part of the Buyer for any damage or claim brought by any bidder because of such rejections, nor shall the bidders seek any recourse of any kind against the Owner or Engineer because of such rejections. The filing of any bid in response to this invitation shall constitute an agreement of the bidder to these conditions. Project Locations: INDUSTRIAL SUBSTATION CENTRAL SUBSTATION 1510 PROGRESS ST 505 W. CHICAGO RD STURGIS, MI 49091 STURGIS, MI 49091 This Construction Contract covers work at the City of Sturgis' Industrial Substation and Central Substation. The project description and summary below are intended to provide the Construction Contractor with the overall scope of work and required schedule, but note that not every detail of the work required is listed. The Contractor is required to review the construction drawings, specifications, site conditions and to fully complete the construction project. Industrial Substation 69kV Transmission Line Relay Panel 1. Remove existing 69kV line relay panel. 2. Disconnect power & control cable to be reused. 3. Install new 69kV line relay panel (Owner provided). 4. Install panel to panel wiring. 5. Install fiberoptic cable from AEP splice box to relay panel. Central Substation 69kV Transmission Line Relay Panel, Breaker Replacement, & PT Installation 1. Install new 69kV line relay panel (Owner provided). 2. Install power & control cables. 3. Install panel to panel wiring. 4. Relocate & Install 69kV Breaker & 69kV PT from Ross Substation to Central Substation. 5. Install new breaker & PT stand foundations. 6. Install steel PT stand & fuse box. 7. Install control cable conduit. 8. Install fiberoptic cable from AEP splice box to relay panel. 9. Site restoration. Question Deadline 07/22/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Attn: Nic Winsemius Email: nwinsemius@verdantas.com 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Post-Bid

Industrial

$147,000.00

Public - City

Site Work

45

19

2

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
61
Bidding Soon
728
All Active Projects
353
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2024

August 28, 2024

img_map_placeholder

1510 Progress St, Sturgis, MI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.