BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 25, 2024 at 8:00 PM

Updated October 26, 2024

Site work for a water / sewer project in Woodland, Mississippi. Completed plans call for site work for a water / sewer project.

The work in this project consists of the installation of concrete flexamat around the existing lagoon to stabilize slope and associated earthwork and stabilization in Woodland, MS. Proposal Security in the form of Certified Check or acceptable Bid Bond in the amount equal to at least five percent (5%) of the Base Bid Bids on the Project must be received on or before the period scheduled for the project and no bid withdrawn after the scheduled closing time for the project for a period of forty-five (45) days. The Owner reserves the right to reject any and all bids on any or all projects and to waive informalities. Question Deadline 08/23/2024

Under Construction

Water / Sewer

$79,856.00

Public - City

Site Work

6

12

4

10

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
26
Bidding Soon
338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

October 18, 2024

Project location map

Multiple Locations, Woodland, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.