BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a communication facility in Shrewsbury, Massachusetts. Completed plans call for site work for a communication facility.

The Project includes all labor, material, and equipment to complete and install a fully functioning Fiber Network and associated installation of the following: 1.Signal transmission lateral fiber optic cable(s) from SELCOs existing Backbone fiber ring to each of the identified splitter cabinets. 2.Signal distribution lateral fiber optic cable(s) from the identified splitter cabinets to the predetermined fiber access point public right of way locations as indicated on the design drawings. 3.Fiber optic cable splicing along with pre, and post installation testing of all fiber installed throughout the network. 4.SELCO will provide some of the required materials for the Project, a list of which can be found listed in the exhibits to this Bids documents. The Project site locations consist of areas on and along various public and private ways in the Town of Shrewsbury as indicated in the design drawings within this bid complete Invitation for Bids packet. Every bid must be accompanied by a bid deposit in the form of: (1) a bid bond, (2) cash, or (3) a certified check on, or a treasurers or cashiers check issued by a responsible bank or trust company, payable to SELCO. The amount of the bid deposit shall be five per cent (5%) of the total value of the bid. The selected contractor shall, within 10 days of the notification of contract award, post a security bond for Payment of labor and materials, etc., in accordance with MGL c. 149, section 29, and in the amount of 100% of the total Contract Price. The Project is subject to the Massachusetts Prevailing Wage Laws and a schedule of prevailing wage rates is included in the complete Invitation for Bids packet. SELCO reserves the right, however, to cancel this Invitation for Bids, to waive informalities, to reject any and all bids, if any such action is deemed to be in the public interest. Questions to SELCO re: IFB August 23rd, 2024

Award

Communication

$325,224.00

Public - City

Site Work

29

6

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
342
Active Projects
177
Bidding Soon
3,294
All Active Projects
1,349
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2024

September 23, 2024

img_map_placeholder

To Be Determined, Shrewsbury, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.