BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Morrow, Georgia. Conceptual plans call for the renovation of a educational facility.

Design Professional Services for DP Renovation of Harry Downs Building for Nursing & Dental Hygiene, Clayton State University, Morrow, Georgia. Questions about any aspect of the RFQ/RFP, or the project. The purpose of the project is to accommodate the SON and DHP instructional laboratory and clinical functions in spaces with improved functional quality and capacity. The primary goals are to improve student outcomes while enabling potential program and enrollment growth. Non-COH occupants currently in Harry Downs will be relocated permanently to enable the project. Key project scope elements are: o Full renewal of building HVAC systems (air handlers, VAV, terminal units, and controls) o Renovation and selective reconfiguration of ~65% of the building (~32K GSF). Priority needs are: o Expansion and optimization of Nursing simulation, practice, and instructional labs (currently on multiple floors in Harry Downs) o Relocation and enhancement of Dental Hygiene clinic and instructional labs (currently in Edgewater) o New clinical/simulation equipment - significant for Dental Hygiene Program, selected for Nursing Program o Associated student support facilities and modest engagement/collaboration/study space for COH students o Office and service space for faculty and staff (CON, DHP, and COH admin) o Instructional technology upgrades in remaining general classrooms (intended for use by both COH and other CLSU users) o Selective, modest common area upgrades. Project Delivery Method The delivery method for this Project will be Construction Management at Risk (CMaR), and, as a minimum, will employ the services of a Program Manager and a Commissioning Agent in addition to the services of the Design Professional. The Design Professional's services are anticipated to commence by Fall 2024 with construction documents anticipated for completion in Fall 2025. The method of Contractor Selection has not been Determined at this time.

Conceptual

Educational

$10,200,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
50
Bidding Soon
1,537
All Active Projects
581
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

img_map_placeholder

2000 Clayton State Blvd, Morrow, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.