BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Savanna, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of September 11, 2024, this project has not yet been awarded. The project is expected to be awarded on October 8, 2024. CDBG Water Main Replacements Est. Completion Date: June 30, 2025. Description: Replacement of approximately 2000 LF of 12" PVC water main, 2, 978 LF of 8" PVC water main, hydrants, appurtenances, and associated pavement/surface restoration. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. Bids may be held by the City of Savanna for a period not to exceed 60 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. No bid may be withdrawn within 60 days after the actual date of the opening thereof. Question Deadline 07/25/2024 Bidders must not be excluded from participating in any federal assistance program [24 CFR 85, Subpart C 85.35; 2 CFR 200.214]. This project is funded in whole or in part with grant funds from the Community Development Block Grant (CDBG) program. Attention is called to the fat that 1) not less than the Federal prevailing wages as set forth in the Contract Documents must be paid on this project: 2) The work to be performed under this contract is subject to the requirements of Section 3, 24 CFR Part 75; and 3) The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin.

Award

Water / Sewer

$1,993,425.00

Public - City

Paving, Site Work

45

14

2

8

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
44
Bidding Soon
658
All Active Projects
292
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

September 2, 2024

img_map_placeholder

Multiple Locations, Savanna, IL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.