Published August 14, 2024 at 8:00 PM

Updated August 15, 2024

Site work and paving for a road / highway in Almond, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project Location On Route 1: 4th Ave. At Route: 4th St. Toward Route: CTH EE Town of Almond-Portage County 001-Pulverization: Approximately 11,555.56 SY Pulverize existing asphalt pavement. (330.3) Grade existing pulverized asphalt pavement to a width of twenty-six (26) feet. Unit cost for Item 001-Pulverization of Existing Asphalt Pavement Extended cost for Item 001-Pulverization of Existing Asphalt Pavement 002-Sawing: Sawcut existing asphalt for a clean butt joint. Sixty-Five (65') Feet Approximate LF (West End) 4th Street Seventy-Three (73) Feet Approximate LF (East End) County Road EE One Hundred & Thirty-Eight (138') Feet Total Approximate LF Asphalt Sawing (690.3.3) Unit cost of item 002-Sawing of Existing Asphalt Extended cost of item 002-Sawing of Existing Asphalt 003-Base Course: Approximately 2,400 Tons Furnish and install three (3) inches of WISDOT Spec. 1-1/4" BAD Material to a width of twenty-six (26') feet. Fine Grade WISDOT Spec. 1-1/4" BAD Material Furnish and Install Water for Dust Control and Compaction. Furnish and Complete Compaction on WISDOT Spec. 1-1/4" BAD Material (301.3.4.2) Unit cost of Item 003-Base Course Extended cost of Item 003-Base Course 004-HMA Pavement: Approximately 1.400 Tons Furnish and Install WISDOT Spec. Type L Asphalt Mix-Twenty (20) feet wide. Compact WISDOT Spec. Type L. Asphalt Mix to a thickness of Two (2) inches Unit cost of Item 004-HMA Pavement Extended cost of Item 004-HMA Pavement 005-Shouldering/Base Course: Approximately 360 Tons - Furnish and Install WISDOT Spec. inch BAD Material creating a Two (2)-foot shoulder (305.3.4) - Furnish and Complete Compaction on WISDOT Spec. % inch BAD Material Furnish and Install Water for Compaction Unit Cost for Item 005-Shouldering/Base Course Extended Cost for Item 005-Shouldering/Base Course 006-Driveway(s)/Field Entrance(s)-Base Course LS Furnish and Install WISDOT Spec. 4 inch BAD Material for all personal driveways and field entrance transitions. - Furnish and Complete Compaction on WISDOT Spec. % inch BAD Material. Furnish and Install Water for Compaction. Extended Cost for Item 006-Driveway(s)/Field Entrance(s)-Base Course 007-Traffic Control/Signage LS -Furnish and maintain all traffic control, signage, flags, flag-persons, barricades and lights where required, to protect the safety of the traveling public and workers, in accordance with the Manual on Uniform Traffic Control Devices Extended Cost for Item 007 Traffic Control/Signage 008- Corrugated Metal Pipe LF Remove three existing corrugated metal pipes. Install One, eighteen (18") inch by forty (40') feet corrugated metal pipe. Install One eighteen (18") inch by twenty-eight (28') foot corrugated metal pipe. Install One, eighteen (18") inch by twenty-eight (28') foot corrugated metal pipe. Maintain correct pipe cover according to CMP Manufacturer. Unit Cost for Item 008-Corrugated Metal Pipe Extended Cost for Item 008- Corrugated Metal Pipe 009-Mobilization LS Extended Cost for Item 009-Mobilization Total Project Cost Specials/Other. Utilities: Contractor is responsible for all Utility Locates and Relocates. Liability Insurance: The contractor shall furnish and deliver to the owner a certificate of insurance for worker's compensation and an umbrella certificate of liability and property insurance before beginning work, and shall notify the owner immediately of any cancellation or change in insurance coverage. Engineers Certification: An Engineer's Certification is required pursuant to s. 86.31(2)(e), Wis. Stats. The certification must include the signature and stamp of a registered professional engineer, stating that the design, plans, and specifications were assembled with a 10-year design life criteria for the improvement, and that the design and construction were accomplished using current WisDOT specifications pursuant to Ch. Trans 206.03(10) (b). Refer to the Local Roads Improvement Program (LRIP) Guidelines and Requirements, Appendix R for a sample of an Engineer's Certification. Performance Bond: A Performance Bond in the amount of 100 percent of the total bid price will be required of the successful bidder in accordance to Wis. Stat. 779.14(1m)(d)3. Questions and Submittal Contact: Kip Gutke Town of Almond Chairperson 8411 North 6th St. Almond, WI 54909 715-340-9960

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
85
Bidding Soon
883
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2024

August 19, 2024

Project location map

4th Ave, Almond, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.