Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 21, 2025 at 8:00 PM
Updated August 22, 2025
Site work and paving for a civil project in Almond, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Township of Almond 5th Street Project Proposal Project Overview Fifth Street, From Akron Ave. To County Road D, Approximately 5,335.5 Ft. North. Pulverization Pipe Removal & Installation Base Course Hma Pavement Shouldering Project Location On Route: 5th St. At Route: Akron Ave. Toward Route: Cth D Town of Almond-portage County 001-existing Asphalt Pulverization: Approximately 11,800 Sy Remove Sod From Shoulders-25 Ft. Width. Pulverize Existing Asphalt Pavement. Furnish and Install Water for Dust Control and Compaction. Grade Existing Pulverized Asphalt Pavement-25 Ft. Width. - Furnish and Complete Compaction Total Cost for Item 001 002-sawing: Sawcut Existing Asphalt for a Clean Butt Joint. 86 Feet Approximate Lf Sta. 53+35.5 Sta. 0+00 5th Street and County Road D 27 Feet Approximate Lf 5th Street and Akron Ave. 113 Feet Total Approximate Lf Asphalt Sawing Total Cost of Item 002 003-base Course: Approximately 2,546.42 Tons - Furnish and Install 3 Inches (0.25 Ft.) of Wisdot Spec. 1-1/4" Bad Material (Sta. 0+00 to 53+35.5) Furnish and Install Additional 2 Inches (0.17 Ft.) of Wisdot Spec. 1-1/4" Bad Material ( 27 + 12.5 to 31+42.8) Fine Grade Wisdot Spec. 1-1/4" Bad Material Furnish and Install Water for Dust Control and Compaction. Furnish and Complete Compaction on Wisdot Spec. 1-1/4" Bad Material Total Cost of Item 003 004-hma Pavement: Approximately 1,400 Tons Furnish and Install Wisdot Spec. Type4lt 58-285 Asphalt Mix Maintaining 20ft Width. Compact Wisdot Spec. Type 4lt 58-285 Asphalt Mix to an Average Thickness of 2 Inches 005-shouldering/pe Approaches: Approximately 400 Tons Furnish and Install Wisdot Spec. 1/2 Inch Bad Material Creating a 2-foot Shoulder Furnish and Complete Compaction on Wisdot Spec. 3 1/2 Inch Bad Material Furnish and Install Water for Compaction - Furnish and Install Wisdot Spec. 1/2 Inch Bad Material Creating Smooth Transitions for Pe Approaches Total Cost for Item 005 006-traffic Control/signage: -furnish and Maintain Traffic Control/signage for Project Duration. Total Cost for Item 006 007-corrugated Metal Pipe Removal: - Contractor to Coordinate With Owner to Dispose of Existing Cmp's. -sta. 28+37.3 Qty. 1 Cmp Diam: 18in Approx. Length: 30 Ft. -sta. 38+03.4 Qty. 1 Cmp Diam: 18in Approx. Length: 30 Ft. -sta. 43+14.7 Qty. 1 Cmp Diam: 18in Approx. Length: 30 Ft. Total Cost for Item 007 008-corrugated Metal Pipe Installation: Furnish and Install Corrugated Metal Pipes (Cmp) at Station Locations Below. - Maintain Correct Pipe Cover According to Cmp Manufacturer. Backfill Pipe Trench Free of Rocks & Debris Within 1 Ft. Of Cmp. Compaction Shall Be Achieved in Lifts Not Exceeding 0.5 Ft. Utilize Existing Subgrade for Backfill if Suitable. Sta. 14+94.0 Qty. 1 Cmp Diam: 12in Length: 36 Ft. Sta. 28+37.3 Qty. 2 Cmp Diam: 18in Length: 30 Ft. Qty. 1 Cmp Diam: 18in Sta. 38+03.4 Length: 30 Ft. -sta. 43+14.7 Qty. 1 Cmp Diam: 18in Length: 30 Ft. Total Cost for Item 008 009-roadway Drainage Excavation: Remove Organic Material/sod From Ditch (Sta. 14+48 to Sta. 15+74) Right. Grade to Create a Smooth Transition to Inlet. Excavate Inlet Sump at 14+94.0. (Right) Total Cost for Item 009 Total Project Cost Specials: Utilities: Contractor is Responsible for All Utility Locates and Subsequent Re-locates. Culvert(S); Hdpe (High Density Polyethylene) May Be Substituted for Corrugated Metal Pipes (Cmp). Furnish Hdpe Culvert Pipes, With a Corrugated Outer Wall and a Smooth Inner Liner. Ensure That the Culvert Pipe Conforms to Aashto M294 Type S. Liability Insurance: The Contractor Shall Furnish and Deliver to the Owner a Certificate of Insurance for Worker's Compensation and an Umbrella Certificate of Liability and Property Insurance Before Beginning Work and Shall Notify the Owner Immediately of Any Cancellation or Change in Insurance Coverage. Performance Bond: A Performance Bond in the Amount of 100 Percent of the Total Bid Price Will Be Required of the Successful Bidder in Accordance to Wis. Stat. 779.14(1m) (D)3. Questions and Submittal Contact: Town of Almond Chairperson Kip Gutke 715-340-9960
Award
Roads / Highways
$400,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2025
September 18, 2025
5th St, Almond, WI
Related To This Project
Almond, WI
Bid Date: Jul 29 2024
Almond, WI
Bid Date: Jul 18 2024
Almond, WI
Bid Date: Aug 09 2022
West Bend, WI
Bid Date: Aug 21 2025
Kaukauna, WI
Bid Date: Aug 22 2025
Mukwonago, WI
--
Mauston, WI
Bid Date: Aug 07 2025
Chippewa Falls, WI
Bid Date: Aug 14 2025
Lake Geneva, WI
Bid Date: Aug 13 2025
Milwaukee, WI
Bid Date: Aug 13 2025
Milwaukee, WI
Bid Date: Aug 29 2025
Elcho, WI
Bid Date: Jul 31 2025
Racine, WI
Bid Date: Aug 11 2025
Marshfield, WI
Bid Date: Sep 11 2025
Madison, WI
Bid Date: Aug 29 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
