BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in North Las Vegas, Nevada. Completed plans call for site work for a road / highway.

Type: District-1 Contract Cost Range: R13 ($515,000.01 to $620,000) Funding Type: Federal Opening Office: Carson City County(s): Clark Enterprise Goal: 8 % Location: SR 574, Cheyenne Avenue from Jones Boulevard to Michael Drive Work Description: construct median islands Project Manager: Shawn Paterson Designer: Collings, Bryce Resident Engineer: Boedigheimer, Brian Contract Days: 25 (working) Liquidated Damages: $4,500.00 All proposals must be accompanied by a proposal guaranty (bid bond or other guaranty) made unconditionally payable to the Nevada Department of Transportation in the amount equal to 5% of total bid amount. The guaranty may be cash, cashiers check, certified check, money order, bank draft, an undertaking executed by a corporate surety company authorized to do business in the State of Nevada, an electronic bid bond validated with Surety 2000 or Sure Path, or any other guaranty that may be especially approved by the Department. NVDOT - Construct Median Islands - SR 574 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Any questions regarding the project must be submitted in writing via the Department's website . Questions should be submitted before 4:00pm Pacific Time 10 days prior to the scheduled bid opening to ensure an answer. Questions submitted after the deadline will be answered at the discretion of the Project Manager For questions regarding bid preparation, obtaining plans, specifications and project documents, please contact: NDOT Contract Services 1263 South Stewart Street, Room 101 Carson City, NV 89712 Phone: (775) 888-7070 Hours: 8:00am - 5:00pm Monday to Friday The 2021295 REMOVE PAVEMENT MARKINGS 186 SQYD represent the removal of the existing turn arrows throughout the length of the project located in the left hand turn lanes..

Award

Roads / Highways

$591,568.00

Public - State/Provincial

Site Work

18

13

3

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
19
Bidding Soon
435
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

September 2, 2024

img_map_placeholder

NV-574, North Las Vegas, NV

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.