Renovation of a transportation facility in Milwaukee, Wisconsin. Completed plans call for the renovation of a transportation facility.

Bid South Shop Maintenance Switch Gear Replacement project GMIA Installation project GMIA (5300 S. Howell Ave., Milwaukee WI 53207) per Statement of Work and all line item requirements. NOTE: Work must be performed over Labor Day weekend without interruption through completion. Question Deadline 07/29/2024 at 10:30 AM CT Deadline to submit Questions Online. Description: Demolition and installation of GMIA provided switch gear The following work is to be performed over Labor Day weekend without interruption through completion. The Switchgear Replacement Project encompasses a comprehensive scope of work aimed at efficiently and effectively replacing the existing switchgear system with a new one. The project initiates with the mobilization phase, ensuring all necessary permits and approvals are secured, and equipment, materials, and subcontractors are mobilized to the site, ensuring the inclusion of TBE support. Safety measures are promptly set up on-site to guarantee a secure working environment for all involved parties. Subsequently, the site is diligently prepared for the upcoming weekend shutdown, with a keen focus on ensuring all essential tools and equipment are readily available for seamless execution. A crucial aspect of the project involves coordination with WE Energies to facilitate a power shut-off and energizing, with the implementation of lockout/tagout procedures for enhanced safety during the shutdown process. Owner to supply on site generator along with proper connections and transfer switch installation. The disconnection and removal phase entail the careful disconnecting of all piping and wiring from the existing switchgear, followed by the safe removal and disposal of the outdated system. The subsequent installation of the new switchgear system necessitates precision and expertise to seamlessly integrate it in place of the old unit, ensuring that the existing piping and wiring are reinstated into the new setup. Testing and verification procedures should be rigorously conducted post-installation to ascertain the functionality and compliance of the new switchgear system. Ensure thorough testing is carried out to validate the correct operation of all systems while ensuring they meet stringent safety and performance standards. The project culminates with the system turnover phase, where final inspections are completed, and any remaining issues are promptly addressed. Additionally, the inclusion of TBE/DBE participation in compliance with the Milwaukee County Electrical Contract underscores the project's commitment to diversity and inclusivity in the bidding process.

Sub-Bidding

Transportation Terminals

$438,576.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
61
Bidding Soon
1,263
All Active Projects
515
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.