BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Crystal City, Texas. Completed plans call for the renovation of a residential development.

1. All popcorn on ceiling to be removed completely to surface of sheetrock. All cracks, broken, soft spots in sheetrock/studs must be replaced. Walls and ceiling must be textured and painted after all repairs (No spraying allowed to texture ceiling). a. Install smoke alarms in all bedrooms and one common area (near living room and kitchen area at hallway entrance). 2. All floor tile must be removed in unit completely including water heater closet and pantries. All base trim removed and replaced with colonial base trim, caulked top and bottom, and painted. Kitchen cabinets on bottom must be finished with 3/4 round trim or caulked properly 3. Install complete door units and hardware to replace all damage interior/exterior door unit. All door/trims must be painted and caulked. Front and rear door combos must be replaced when damaged and advised by maintenance supervisor. 4. Replace all old and damage light fixtures, (inside/outside) all outlets covers and no wires can be exposed. 5. Install new heater, light, vent fixture, and include switch and cover. All vents on ceiling and walls. 6. Damage bathroom vanity, commode, shower head, shower tub and tub must be replaced. Vanity faucet, shower faucet, cut-offs, water supply lines, P-trap, pop-ups, toilet paper holder, towel rack, medicine cabinet, must be replaced. Including any and all adjustments. 7. Bathroom walls must be replaced with water proof sheetrock. Tub walls must include ceiling. Finish properly with vinyl around window. All walls and ceiling must be textured, painted and caulked. 8. Kitchen faucets must be replaced, including strainers, P-trap, cut-offs, and supply lines. Damage cabinets must be repaired or replaced and have all hardware, endcaps in place, and painted as required. 9. Storage rooms ceilings and walls must be replaced if damage and painted. Floor must be cleaned with no damage to its foundation. Door must have proper hardware. 10. Damage or rusted rangehood must be replaced. 11. Unit floor tile must be buffed and waxed. 12. Complete clean up of entire unit and disposed all material as required (inside and outside). 13. All windows must work properly if damaged must be replaced including window pane. 14. All units are TURNKEY projects.

Under Construction

Residential Subdivision

$30,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
12
Bidding Soon
284
All Active Projects
120
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2024

August 12, 2024

img_map_placeholder

To Be Determined, Crystal City, TX


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.