BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2024 at 8:00 PM

Updated September 26, 2024

Renovation of a mixed-use development in Waukesha, Wisconsin. Completed plans call for the renovation of a multi-residential development.

Phase VI of a kitchen, bathroom, and plumbing system remodeling for Saratoga Heights & Location: 120 Corrina Blvd. Waukesha, Wisconsin 53186 A kitchen, bathroom, and plumbing system remodeling in an existing 6-story midrise senior living facility built in 1972. This is the sixth phase of the remodeling project. The 30 units being remodeled will be vacated; however, the rest of the building will remain occupied General Construction. A General Contractor will administer subcontractors. Prevailing wage rates will apply. Wage interviews are mandatory and will be conducted on a regular basis. Anyone failing to comply with wage interviews will be asked to leave the site. Construction Start: Monday, September 4, 2024 Completion Date: Monday, November 4, 2024 All questions shall be directed to Madisen Maher Architects, 133 W. Pittsburgh Ave, Suite 102, Milwaukee, WI 53204, Telephone: (414) 277-8000, Email: erik@madisenmaher.com Questions must be submitted in writing via hard copy or email to the Architect by Thursday, July 25th, 2024, at 11:00am. Bid Bond: 5% of the overall project value Performance and Payment Bond: 100% Surety Bond will be required upon contract award.

Under Construction

Multi-Residential

$210,000.00

Public - City

Renovation

10

16

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
401
Active Projects
220
Bidding Soon
2,166
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

September 6, 2024

Project location map

120 Corrina Blvd, Waukesha, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.