BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 19, 2024 at 8:00 PM

Updated October 20, 2024

Site work and new construction of a water / sewer project in Alexandria, Virginia. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The EC's 5th Floor is one of six floors within AlexRenew's administrative building. When the EC was initially constructed, the first, second, third, fourth, and sixth floors were built-out. The entire approximately 11,600-square-foot 5th floor was left unfinished, with the intent of building it out at a later date. The construction of EC 5th Floor Buildout Project includes architectural, plumbing, fire suppression, mechanical, electrical, and fire alarm scope. The architectural scope includes demolition (limited), doors, gypsum board/metal stud framed partitions, finishes, casework, raised access flooring, and demountable partitions. Please read the instruction in the attached PDF. The intent of this Invitation to Apply for Prequalification (IPQ) process (Procurement) is for the City of Alexandria Sanitation Authority, d/b/a as AlexRenew to identify qualified General Contractors with successful experience in the in the construction of facilities similar to the Environmental Center (EC) 5th Floor Buildout Project. This Prequalification is for General Contractors only. Prequalification Applications will NOT be accepted from subcontractors. Established in 1952 by the Virginia Water and Waste Authorities Act, AlexRenew's mission is to clean wastewater to protect public health and Alexandria's waterways. AlexRenew is governed by a fivemember citizen Board of Directors and is a political subdivision of the Commonwealth of Virginia. AlexRenew serves more than 300,000 people in the City of Alexandria and parts of Fairfax County, Virginia. It currently maintains capital assets valued at approximately $1.2 billion and treats approximately 38 MGD (up to 116 MGD during wet weather) of wastewater at its WRRF, located in Alexandria, Virginia. The estimated construction cost for the 5th Floor Buildout is $3,000,000 and scheduled to be complete by April 2025. Notice to Proceed for construction is anticipated in October 2024. July 30, 2024, 2:00 PM ET Last Date to Submit Questions Regarding IPQ All communications with AlexRenew's POC about the project or this solicitation shall be in writing, as required by applicable provisions of this solicitation. Igor Scherbakov Procurement Manager 5thFloorBuildout-25-003@alexrenew.com

Award

Water / Sewer

$2,003,552.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
13
Bidding Soon
1,885
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2024

November 19, 2024

Project location map

1800 Limerick St, Alexandria, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.