Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 6, 2024 at 8:00 PM

Updated September 7, 2024

Site work and new construction of a water / sewer project in Jackson Center, Ohio. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The Water Treatment Plant Improvements Project Includes the Replacement of the Existing Water Treatment Plant and Other Related Work. Bids Must Be Signed and Submitted on the Separate Bidding Forms Included in the Bidding Documents, Sealed in the Provided Envelope, and Shall Be Accompanied by Either a Bid Guaranty Bond in the Amount of 100% of the Bid Amount or by a Certified Check, Cashier's Check, or Letter of Credit on a Solvent Bank in the Amount of Not Less Than 10% of the Amount of the Bid, Subject to Conditions Provided in the Instructions to Bidders. Bid Security, Furnished in Bond Form, Shall Be Issued by a Surety Company or Corporation Licensed in the State of Ohio to Provide Said Surety. The Successful Bidder Will Be Required to Furnish a Satisfactory Performance Bond in the Amount of 100% of the Bid. All Contractors and Sub-contractors Involved With the Project Will, to the Extent Practicable, Use Ohio Products, Materials, Services, and Labor in the Implementation of Their Project. Additionally, Contractor Compliance With the Equal Employment Opportunity Requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and Governor's Executive Order 84-9 Shall Be Required. Attention of Bidders is Called to All of the Requirements Contained in This Bid Packet, Particularly to the Federal Davis Bacon Prevailing Wage Rates, Encouragement of Disadvantaged Business Enterprises (Dbe) Utilization, Various Insurance Requirements, Various Equal Employment Opportunity Provisions, and Section 3 Requirements. **Document Notes: Non-refundable Checks Are to Be Payable to Access Engineering Solutions, Llc.

Award

Water / Sewer

$4,800,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
119
Bidding Soon
2,216
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

September 23, 2024

Project location map

To Be Determined, Jackson Center, OH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed