Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 10, 2024 at 8:00 PM

Updated October 11, 2024

Site work and renovation of a civil project in Byrnes Mill, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Lower Big River Regionalization Project Collection System. Description: The Work comprises the Jefferson County Public Sewer District Lower Big River Regionalization Project Collection System. The Work of this Contract consists of the following improvements: 1. Byrnes Mill Mobile Home Park (Forcemain & Gravity Sewers): Construction of 1,757-feet of 8-inch gravity sanitary sewers (Sta. 6+46.9 to Sta. 13+11.4 & Sta. 32+81.4 to Sta. 44+21.4), 14 manholes, and 2,681-feet of 6-inch forcemain (Sta. 6+46.9 to Sta. 32+81.4). 2. Byrnes Mill Mobile Home Park (Pump Station & Lagoon Modifications): Construction of 767-feet of 8-inch gravity sanitary sewers (from PS & lagoon to Sta. 6+46.9), 7 manholes, two duplex submersible pump stations and valve vaults, 670-feet of 6-inch forcemain (Sta. 0+00 to Sta. 6+00), abandonment of two sanitary pump stations, and conversion of WWTF lagoon to wet-weather storage. 3. House Springs Interim Pump Station & Forcemain: Construction of interim pump station, and 5,016-feet of 12-inch forcemain (Sta. 0+00 to Sta. 50+16). 4. Northwest Valley Middle Interceptor Sewer: Construction of 4,628-feet of 12-inch and 144-feet of 8-inch gravity sanitary sewers, 29 manholes, and abandonment of two WWTF's and two pump stations. 5. House Springs Interceptor Sewer (Lower Reach): Construction of 5,382-feet of 12-inch (Sta. 57+80 to 84+15.7) and 739-feet of 8-inch gravity sanitary sewers (Sta. 0+00 to Sta. 7+75.3), 31 manholes, and abandonment of two WWTF's. 6. House Springs Interceptor Sewer (Upper Reach): Construction of 2,609-feet of 12-inch gravity sanitary sewers (Sta. 2+06 to Sta. 57+80) and 9 manholes. MBE (11.4%), WBE (6.9%) Question Deadline 08/14/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered .

Bid Results

Water / Sewer

$6,799,380.00

Public - County

Renovation, Site Work

114

22

77

16

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
111
Bidding Soon
1,551
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2024

November 6, 2024

Project location map

Multiple Locations, Byrnes Mill, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed