BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Hoopeston, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of July 30, 2024 project was awarded to Mid Illinois Concrete & Excavation but awarded amount is not available.** City/County - Hoopeston Seal Coat Program 882 Gal HFRS, 1234 Gal MC-30, 100 Ton CA-7 Cr. Stone, 32 Tons CA-16 Cr. Gravel, 294 Ton Hot-Mix Asphalt, 2625 Sq Yd Bit. Surf Removal 2", 1260 Sq Yd Bit. Surf Removal 3" Project Location: Various Locations in the City of Hoopeston Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. ILDOT - Seal Coat Program 882 Gal HFRS This work shall consist of constructing a bituminous hot mixture in accordance with the applicable sections of 403, 1030, and 1032 of the standard specifications except as revised herein. Prequalification of Bidder: Prospective bidders must be pre-qualified in accordance with Local Roads Check Sheet LRS 6. A current copy of the "Certificate of Eligibility" is required to obtain bid documents. Bidding Requirements: All proposals must be accompanied by a bank cashier's check, certified check, bank draft, or bid bond. Checks or bank drafts shall be made payable to Treasurer, Hoopeston, Illinois. The deposit of the successful bidder will be held until final completion of this contract. Prevailing Wage: All work performed under this contract shall at a minimum meet the prevailing wage rates as found by the County, Department of Labor, or as determined by the court on review. Notification of Construction: Contractor shall notify the Village and Engineer three days prior to commencing work, per article 107.09. Traffic Control: Traffic control shall be in accordance with the applicable sections of the Standard Specifications for Road and Bridge Construction, the applicable guidelines in the Illinois Manual of Uniform Traffic Control Devices for Streets and Highways, these Special Provisions, and any details and highway standards contained herein and in the plans. Highway Standards: 701301, 701901 The cost of traffic control will not be paid for separately, but shall be considered included in the contract. Construction Operations: Contractor shall prime existing surfaces with MC-30 24 hours prior to laying hot mix asphalts. Manhole lids and valve covers shall be covered and protected during all operations. Upon completion of the operations, all manhole lids and valve covers shall be uncovered and cleaned. The cost of this work will not be paid for separately, but shall be considered included in the contract. Application Rates: The estimated HMA quantity was based on placing a single lift with an average compacted thickness of 2". Completion Date: All operations shall be complete before August 31st, 2024

Award

Roads / Highways

$130,000.00

Public - City

Paving, Site Work

6

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
68
Bidding Soon
645
All Active Projects
309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2024

August 16, 2024

img_map_placeholder

Multiple Locations, Hoopeston, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.