Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 29, 2024 at 8:00 PM

Updated August 30, 2024

Site work for a bridge / tunnel in Alma, Illinois. Completed plans call for site work for a bridge / tunnel.

City/County : Marion Description: 1 Removal and Disposal of Unsuitable Material - Cu Yd 57 2 Channel Excavation - Cu Yd 25 3 Aggregate Surface Course, Type B - Ton 121 4 Pipe Culvert Removal - Foot 52 5 Concrete Structures - Cu Yd 9.8 6 Reinforcement Bars - Pound 940 7 Box Culvert End Sections, Culvert No. 1 - Each 2 8 Mobilization - L Sum 1 9 Precast Concrete Box Culverts (Special) - Foot 24 10 Porous Granular Embankment (Special) - Ton 238 11 Seeding, Class 2 (Special) - Acre 0.25 12 Stone Dumped Riprap, Class A4 (Special) - Ton 50 13 Waterproofing Membrane System for Buried Structures - Sq Yd 63 14 Traffic Control and Protection, Special - L Sum 1 15 Excavation and Backfill for Structures - L Sum 1 Prequalification of Bidders. Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. Project Location: Near the SE Corner, NE 1/4, Section 36, T4N, R2E, 3rd PM ILDOT - Channel Excavation

Award

Bridges / Tunnels

$2,827,250.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
71
Bidding Soon
1,034
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2024

August 19, 2024

Project location map

Multiple Locations, Alma, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed