Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 28, 2024 at 8:00 PM
Updated August 29, 2024
Demolition and site work for a residential development in Joplin, Missouri. Completed plans call for the demolition of a residential development; and for site work for a residential development.
For the demolition of structure(s), and clean up of area at the following location(s): 1202/1204 S Wall Ave. 219 N Pearl Ave. 2025 S Byers Ave. 810 S Missouri Ave. 320 S Winfield Ave. The Planning & Community Development Manager reserves the right to reject any or all bids and to accept the lowest or best bid. SPECIFICATIONS (1) Notify the City of Joplin building division of the date the demolition is to begin so that verification of interior photographs may be made. (2) Remove all structure(s), foundations and footings. (3) Remove all private sidewalks, driveways, and concrete slabs. . (4) Properly cap all utilities with an approved product for the type of utility being capped (gas, sewer, and water) at least 30 inches below natural grade. (5) Remove all debris, dead trees, and stumps. (6) Fill all low areas (after removal of all floors, footings, and foundations) to natural grade elevation compacted to approximate existing density. (7) Completion of demolition shall be one month after notice to proceed. If not completed Within one month, project will be re-bid. (8) Demolition Contractor will be responsible for proper disposal of any asbestos in or on structure to sanitary landfill or other authorized sites as provided by rule. Contractor shall provide upon request copies of landfill or disposal site receipts prior to receiving payment by the City. (9) Contractors need to bid the project without considering salvage values. The City cannot guarantee that salvageable materials will be present when the contractor starts the project. (10) All disturbed ground must be seeded and straw Bid result Big John's Heavy Equipment - 15,690 USA Demolition - 8,500 B & D Yard builders - 4,921
Award
Residential Subdivision
$6,700.00
Public - City
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 19, 2024
August 19, 2024
Multiple Locations, Joplin, MO
Related To This Project
Joplin, MO
Bid Date: Jul 30 2024
Joplin, MO
Bid Date: Jul 23 2024
Joplin, MO
Bid Date: Aug 13 2024
Joplin, MO
Bid Date: Jul 23 2024
Joplin, MO
--
Joplin, MO
--
Joplin, MO
Bid Date: Aug 27 2024
Joplin, MO
Bid Date: Aug 14 2024
Joplin, MO
Bid Date: Jul 16 2024
Joplin, MO
Bid Date: Aug 01 2024
Joplin, MO
Bid Date: Apr 16 2025
Joplin, MO
Bid Date: Apr 21 2025
Joplin, MO
Bid Date: Jun 14 2024
Joplin, MO
Bid Date: Jun 10 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
