Remodeling of an educational facility in Memphis, Tennessee. Completed plans call for the remodel of a educational facility.

Questions or requests for clarification of technical issues and terms pertaining to this Bid must be submitted in writing via e-mail to Vanessa Ketcher at ketchervm@scsk12.org by July 18, 2024 @ 10:00 AM CST LIQUIDATED DAMAGES The successful Bidder accepts this contract with the understanding that should they fail to complete the work/delivery in an acceptable manner and in the time stated, shall be subject to the payment of liquidated damages as stated in the bid document. Liquidated damages for this project are as follows: $500.00 /per day substantial completion deadline missed, and $500.00/per day completion deadline missed BID BOND: Bidders are required to submit a bid bond in the amount of five percent (5%) of the total estimated contract amount for each individual school location, as determined by SCBE and specified in the IFB, to ensure the satisfactory completion of the work for which a contract or purchase order is awarded that may exceed $100K. Should the Bidder withdraw their bid response without entering into a contract the Bid Bond may be forfeited in whole or in par Q&A Posted July 22, 2024, by EOD SCOPE OF WORK The SCBE requests bids for Hamilton HS Stem Lab Remodel. The specifications are contained in the Design Project Manual. Responses submitted must meet or exceed all requirements. Bids that do not meet or exceed all requirements will be considered non-responsive. Scope of work includes, but not limited to, Upgrade existing classroom(s) 229, 212, 227, 132A, and 211 to Stem Lab(s) classrooms to include: Electrical work, painting, floor replacement, lighting upgrade, equipment removal, cabinet demolition, and sink replacement. Estimated start time is 09/16/2024. The substantial completion date is 11/13/2024 and a final completion date of 12/13/2024. Scope of Work: 1. Install/removal of plumbing according to the MSCS plumbing Standards and Requirements Information. Capping of electrical and gas lines should meet standards and requirements according to MSCS. New electrical outlets and wiring for the wall should meet standards and requirements according to MSCS. 2. The Contractor shall be responsible for obtaining Architect/Engineering (A/E) design services by a State licensed A/E firm as needed to obtain plumbing or electrical permits. The construction documents shall be prepared by a registered design professional where required by the statutes of the jurisdiction in which the project is to be constructed or installed. 3. Any permit fees, design fees, printing fees, or application fees shall be paid by the Contractor. 4. Movement of furniture as needed to perform work is the responsibility of the contractor, including moving furniture back into spaces after work is performed. 5. Approved painting products include Sherwin Williams, Farrell Calhoun, PPG, or approved equal. 6. The contractor shall provide a minimum of a 5-gallon bucket of attic stock for all paint used. Contractor to provide paint formulas on all paint used. 7. If contractor wants to work outside of normal operating hours, they shall be responsible for paying overtime for the plant manager to open and close the facility as needed. 8. The MSCS electrical and plumbing standards and requirements below are intended to assist the A/E and Contractor with project expectations.

Bid Results

Educational

$249,604.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
28
Bidding Soon
400
All Active Projects
182
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2024

September 16, 2024

img_map_placeholder

1363 E Person Ave, Memphis, TN

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.