Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 15, 2024 at 8:00 PM
Updated August 16, 2024
Site work and paving for a road / highway in Montrose, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
1) Approximately 1.47 miles of placing and grading soil cement base including prime on Oscar Wynn Road. The contractor will be responsible for designing soil cement mix based on test sampling of subgrade. Project begins at paved intersection of Oscar Wynn and ends at Mt. Olive Road. o Soil Cement base width is 26 feet and 6 inches in depth o Prime and sand 2) Approximately 1.47 miles of triple surface treatment paving on Oscar Wynn Road using #5, #7, and #89 stones along with a Cationic Polymer Modified Rapid Curing Fog Seal. Fog seal shall be placed on project within one week of #89 stone placement. Project begins at paved intersection of Oscar Wynn and ends at Mt. Olive Road. o Fog Seal applied at rate of .12 gallons per SY over top of #89 stone o Approximately 20,696 SY o Pavement width is 24 feet o Temporary center line striping and permanent 5 "center and edge striping FOG SEAL REQUIREMENTS: The fog seal will be used to lock down and secure aggregates on the surface treatment. The material must be applied hot (140-160 degrees). The surface temperature of the roadway shall be 60 degrees Fahrenheit and rising before application shall begin. The material must be rapid curing and must allow traffic to be returned to roadway within one hour after application (For example purposes only: Southeast Emulsions Fastblack). Note: Contractor is responsible for all traffic control and the posting of appropriate. construction signs as required by MUTCD The successful bidder will submit certificate of workers comp., liability insurance and e-verify compliance when the bid is awarded. Payment and performance bonds or if the amount is less than $100,000 an irrevocable letter of credit from a local bank in the amount of 100% of the project cost will also be required. Project must be completed by November 1st 2024.
Award
Roads / Highways
$410,704.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2024
August 26, 2024
Oscar Wynne Rd, Montrose, GA
Related To This Project
Montrose, GA
--
Montrose, GA
Bid Date: Jul 17 2023
Columbus, GA
Bid Date: Aug 09 2024
Athens, GA
--
Atlanta, GA
Bid Date: Aug 07 2024
Jonesboro, GA
Bid Date: Aug 08 2024
Atlanta, GA
Bid Date: Aug 13 2024
Sandy Springs, GA
Bid Date: Aug 12 2024
Kennesaw, GA
--
Marietta, GA
Bid Date: Jul 11 2024
Peachtree City, GA
--
Cumming, GA
Bid Date: Aug 07 2024
Dawsonville, GA
Bid Date: Jul 12 2024
Villa Rica, GA
Bid Date: Jul 18 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed
