Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 15, 2024 at 8:00 PM

Updated August 16, 2024

Site work and paving for a road / highway in Montrose, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

1) Approximately 1.47 miles of placing and grading soil cement base including prime on Oscar Wynn Road. The contractor will be responsible for designing soil cement mix based on test sampling of subgrade. Project begins at paved intersection of Oscar Wynn and ends at Mt. Olive Road. o Soil Cement base width is 26 feet and 6 inches in depth o Prime and sand 2) Approximately 1.47 miles of triple surface treatment paving on Oscar Wynn Road using #5, #7, and #89 stones along with a Cationic Polymer Modified Rapid Curing Fog Seal. Fog seal shall be placed on project within one week of #89 stone placement. Project begins at paved intersection of Oscar Wynn and ends at Mt. Olive Road. o Fog Seal applied at rate of .12 gallons per SY over top of #89 stone o Approximately 20,696 SY o Pavement width is 24 feet o Temporary center line striping and permanent 5 "center and edge striping FOG SEAL REQUIREMENTS: The fog seal will be used to lock down and secure aggregates on the surface treatment. The material must be applied hot (140-160 degrees). The surface temperature of the roadway shall be 60 degrees Fahrenheit and rising before application shall begin. The material must be rapid curing and must allow traffic to be returned to roadway within one hour after application (For example purposes only: Southeast Emulsions Fastblack). Note: Contractor is responsible for all traffic control and the posting of appropriate. construction signs as required by MUTCD The successful bidder will submit certificate of workers comp., liability insurance and e-verify compliance when the bid is awarded. Payment and performance bonds or if the amount is less than $100,000 an irrevocable letter of credit from a local bank in the amount of 100% of the project cost will also be required. Project must be completed by November 1st 2024.

Award

Roads / Highways

$410,704.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
78
Bidding Soon
809
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2024

August 26, 2024

Project location map

Oscar Wynne Rd, Montrose, GA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed