BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Dalton, Georgia. Working plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; and for outdoor lighting for a playground / park / athletic field.

**As of August 1, 2024 project has been canceled. As of this time it is unknown if an when project will rebid. The work to be bid upon shall consist of furnishing all materials, labor and equipment for: Edwards Park Multi-Use Court Revitalization All proposals shall be accompanied by a Bid Bond in favor of the County, in the amount of five percent (5%) of the bid for the complete work; such Bid Bond representing that the Bidder, if awarded a contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the attorney for the County. If required, the Performance Bond shall be equal to one hundred percent (100%) of the contract amount. If required, the Payment Bond shall be equal to one hundred ten percent (110%) of the contract amount. The bid bond shall be forfeited to the County, as described in Section 108 of GDOT Specifications. The County reserves the right to reject any and all bids. A. Work covered by this section of the specifications shall conform to the contract documents, engineering plans as well as state and local codes. B. The purpose of these specifications is to define the lighting system performance and design standards for Edwards Park Pickleball Courts using an LED Lighting source. The manufacturer / contractor shall supply lighting equipment to meet or exceed the standards set forth in these specifications. C. The sports lighting will be for the following venues: 1. Pickleball Courts D. The primary goals of this sports lighting project are: 1. Guaranteed Light Levels: Selection of appropriate light levels impact the safety of the players and the enjoyment of spectators. Therefore light levels are guaranteed to not drop below specified target values for the warranty period. 2. Environmental Light Control: It is the primary goal of this project to minimize glare to the players, spectators and neighboring courts and fields. 3. Cost of Ownership: In order to reduce the operating budget, the preferred lighting system shall be energy efficient and cost effective to operate. All maintenance costs shall be eliminated for the duration of the warranty. 4. Control and Monitoring: To allow for optimized use of labor resources and avoid unneeded operation of the facility, customer requires a remote on/off control system for the lighting system. Fields should be proactively monitored to detect luminaire outages over the warranty period. All communication and monitoring costs for the warranty period shall be included in the bid. Submitted in sealed opaque envelopes, plainly marked with the ITB# 2024-102 - Edwards Park Multi-Use Court Revitalization; Date, Time of bid opening, Your Company Name, and Your Contractor's license number. a. Mailing Address: WHITFIELD COUNTY PURCHASING DEPARTMENT,201 S. HAMILTON STREET,DALTON, GEORGIA 30720 b. Hand Delivery: ATTN: Mr. Brian McBrayer 201 S. HAMILTON STREET, 4th FLOOR DALTON, GEORGIA 30720

Final Planning

Playgrounds / Parks / Athletic Fields

$1,000,000.00

Public - County

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
68
Bidding Soon
1,269
All Active Projects
528
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2024

March 4, 2025

img_map_placeholder

115 Edwards Park Entrance, Dalton, GA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.