BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in Brandon, Manitoba. Completed plans call for the renovation of a medical facility.

TP-5.2: Medium Voltage Substations. On behalf of Prairie Mountain Health, Bockstael Construction Limited has requested proposals for the supply of the Medium Voltage Substations (Transformers). Provide identification and warning signs for complete electrical systems as shown, as specified, as intended, and as otherwise required. Work to be done under this Section to include only the materials, and equipment required for manufacture, testing and putting into proper operation complete systems as shown as specified and as otherwise required. The labour for the installation of the equipment is not included. .1 Transformers shall have voltage and kVA rating as indicated on supplemental drawings. .2 Liquid cooled, outdoor, distribution transformer type KNAN, with provision for fan cooling. .3 The transformer shall be cooled by the natural circulation of air over the tank with an additional rating obtained by forced air circulated over the radiators or corrugate. The unit shall be provided with KNAN/KNAF rated cooling including fans and control equipment. Control power shall be provided by CPTs in the primary switchgear. Additional capacity ratings shall be as follows: 33%. .4 Transformer windings and all current carrying parts shall be copper. .5 Transformers shall be self-contained, free standing units suitable for floor mounting. .6 Provide anti-vibration mountings to isolate not less than 90% of disturbing vibrations. .7 Transformers shall have provisions for incoming and outgoing conductor entry as shown on Drawings. .8 Transformers shall be equipped with grounding provision specified in Table 3 of CSA Standard C9. .9 The transformer shall be furnished with full capacity high-voltage taps. The tap- changer shall be clearly labeled to reflect that the transformer must be de- energized before operating the tap-changer as required in Section 4.3 of IEEE Std C57.12.34TM-2009 standard. Transformers to have four (4) - 22% full capacity primary taps, two above and two below nominal voltage. .10 Three phase transformers shall have Delta connected primary and Grounded Wye secondary. the low voltage neutral shall be a fully insulated XO bushing with ground strap. Provide a removal bus jumper to neutral connection for testing. The low voltage shall lag the high voltage by 30 The Construction Manager or Owner reserves the right in its absolute discretion to accept any Proposal which it deems most advantageous to itself and the right to reject any or all Proposals, in each instance without giving such formal notice. Question Acceptance Deadline: 2024/07/26 05:00:00 PM CDT Official bid documents must be obtained from www.merx.com * The project value listed reflects the package estimate.

Post-Bid

Medical

Public - State/Provincial

Renovation

5

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
17
Bidding Soon
123
All Active Projects
68
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 30, 2024

August 30, 2024

img_map_placeholder

150 McTavish Ave E, Brandon, MB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.