Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 23, 2025 at 7:00 PM
Updated January 24, 2025
Demolition, site work, paving and new construction of a civil project in Bryant, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; and road / highway.
20250114029 9371-00-70 WISC 2025163 CTH J - STH 17, Prairie River Bridge, B-34-0064, CTH H Langlade County Work Summary: Removals, Grading, Aggregate, Asphalt Pavement, Structure Replacement, Beam Guard, Erosion Control, Permanent Signing, Traffic Control, Restoration. Work Type: AF DBE Goal: 3% Guaranty Required: $40,000.00 Estimate Anticipated Funding $1,000,000 - $1,999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. Unless otherwise specified in this advertisement, the Department will issue bidding proposals only to those who have established their qualifications for the work to be bid upon. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than ten business days prior to the time set for submitting bidding proposals on a form furnished by the Department. The Department will evaluate this statement and will issue bidding proposals as it deems warranted. Question Deadline - 01/13/2025 at 11:45 AM CT, Any question submitted after 2 p.m. the Thursday prior to the letting may not have sufficient time to prepare a thorough response or develop a contract addenda. Working Day Contract: 45 Days WI DOT - 029 - CTH J - STH 17, Prairie River Bridge, B-34-0064, CTH H *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This special provision describes inspecting, installing and/or maintaining approved deterrents that prevent migratory bird nesting on bridges and culverts. Swallows or other migratory birds' nests have been observed on or under the existing culvert or bridge at the station identified. All active nests (when eggs or young are present) of migratory birds are protected under the federal Migratory Bird Treaty Act. One deterrent system shall be installed and/or maintained for each applicable structure. Deterrent methods selected shall be appropriate for structure type, size and/or site-specific constraints. The Wisconsin Department of Transportation is committed to the compliant administration of the DBE Program. The DBE provisions work in tandem with FHWA 1273 and WisDOT's Standard Specifications for Highway and Structure Construction and Construction and Materials Manual. The WisDOT Secretary is signatory to assurances of departmentwide compliance. The Department assigns the contract DBE goal as a percentage of work items that could be performed by certified DBE firms on the contract. The assigned DBE goal is expressed on the bid proposal as a percentage applicable to the total contract bid amount. (1) WisDOT identifies the assigned DBE goal in its contract advertisements and posts the contract DBE goal on the cover of the bidding proposal. The contractor can meet the assigned contract DBE goal by subcontracting work to a DBE firm or by procuring services or materials from a DBE firm. (2) Under the contract, the prime contractor should inform, advise, and develop participating DBE firms to be more knowledgeable contractors who are prepared to successfully complete their contractual agreement through the proactive provision of assistance in the following areas: o Produce accurate and complete quotes o Understand highway plans applicable to their work o Understand specifications and contract requirements applicable to their work o Understand contracting reporting requirements (3) The Department encourages contractors to assist DBE subcontractors more formally by participating in WisDOT's Business Development program as a mentor, coach, or resource. For comprehensive information on the Disadvantaged Business Enterprise Program, visit the Department's Civil Rights and Compliance Section website. The work under this contract shall consist of excavation common, remove Structure B-34-0006, Structure B-34-0064, base aggregate, HMA pavement, erosion control, traffic control, landscape, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
Award
Bridges / Tunnels
$814,508.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 14, 2025
March 17, 2025
CTH H, Bryant, WI
Related To This Project
Bryant, WI
Bid Date: Aug 14 2024
Bryant, WI
Bid Date: Sep 10 2024
Bryant, WI
Bid Date: Sep 30 2025
Bryant, WI
Bid Date: Jan 11 2022
Menasha, WI
--
Oshkosh, WI
--
Oshkosh, WI
Bid Date: Feb 11 2025
Omro, WI
--
Menasha, WI
--
Oshkosh, WI
Bid Date: Mar 11 2025
Barton, WI
Bid Date: Feb 11 2025
Oshkosh, WI
Bid Date: May 13 2025
Oshkosh, WI
Bid Date: Mar 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
