BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2024 at 8:00 PM

Updated July 18, 2024

Renovation of a water / sewer project in Lago Vista, Texas. Conceptual plans call for the renovation of a water / sewer project.

Currently, the Wastewater Plant is operating at near 75% capacity. As per TCEQ, this is the threshold where they require an upgrade in capacity begin the design phase. As presented to the City Council at the June 15th, 2023 meeting, the estimated cost for an upgrade to 1.5 MGD (from 1.0 MGD) with Type 2 treatment is $17.4 Million. These costs were based on Present Value of the Dollar, and did not include the Future Value. Also, this cost estimate included the engineering design. Typically, it will take a project of this magnitude about a year to complete design and permitting. Also, a good estimate of engineering design cost is about 10% of the total cost. It is being proposed that a total of $1.74 Million be allocated in FY-24 for the design of this upgrade, and the remainder ($15,660,000) of the cost be programmed for FY-25. Since inflation over the past several years has been higher than average, a cost escalation of 6% was applied to $15,660,000 which is equal to $16,599,600, which increases the cost of this project by $1 Million. The design of this plant will include upgrades to certain elements which will allow for an increased treatment volume, and will also allow for a cheaper upgrade to Type 1 treatment if a future City Council desires to do so. This project is Impact Fee Eligible. The project is included in the City's 2024-2028 Capital Improvement Program (CIP). As of July 17, 2024, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$16,599,600.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
144
Bidding Soon
2,677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.