BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Salem, Oregon. Completed plans call for the renovation of a detention facility; and for site work for a road / highway.

The Work contemplated under this Contract includes all labor, materials, transportation, equipment, and services for, and incidental to, the completion of all construction Work in connection with the project described in the Contract Documents. The following range is a project estimate for bonding purposes: 250,000-400,000 Project Start Date: Ten (10) Calendar Days from NOTICE TO PROCEED Substantial Completion: 9/16/2024 Final Completion: 10/18/2024 Any questions or issues that may arise regarding the Specifications, the bidding process, and/or the award process shall be directed to the Purchaser/Single Point of Contact. Name: Dustin M. Sculatti Phone: (503) 510-5285 E-mail: Dustin.M.Sculatti@doc.oregon.gov Liquidated damages of $400.00 will apply to the contract resulting from this ITB. Failure to substantially complete the Project by the, date of Substantial Completion, as specified in the Contract, will result in damage to the State of Oregon. Moreover, failure to fully complete the Project by the date of Final Completion, as specified in the Contract, will also result in damage to the State of Oregon Since actual damage will be difficult to determine, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but asliquidated damages, $400.00 per calendar day elapsed in excess of the Substantial Completion date stated in Section 4 of the Agreement. Moreover, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $400.00 per calendar day elapsed in excess of the Final Completion date stated in Section 4 of the Agreement. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 1. Remove existing roof system in its entirety down to the steel roof deck. 2. Install the specified roof insulation system and roof recovery board in accordance with Division 7 Section 22 00 "Roof Insulation" 3. Install the specified modified roof system in accordance with Division 07 Section 55 00 "Modified Bituminous Membrane Roofing - Cold Applied" 6. Apply aluminum coating over field and flashings. 7. Install new gutters and downspouts as specified. 8. Prior to roof demo. Provide pipe extension for all pipe vents. Four-inch (4") steel steam vents to be extended to finish of eight- and one-half foot (8'6") above finished roof. Passive two-inch (2") plumbing vents to be twelve inches (12") above finished roof. 9. Provide rust mitigation, such as rust retardant (OSPHO) or approved equal to all rusted plumbing steel vent pipes, steel exhaust stacks and existing continuous passive steel roof vent. 10. Install new paint over the existing continuous passive roof vent. Rust-Oleum enamel or approved equal (Color: Bronze) 11. Demo existing mesh wire and install new pest access prevention system to existing continuous passive roof vent with galvanized 14ga, 1/4 " hardware cloth mesh and 1/2 " x 1/2 " x 1/8" galvanized angle, riveted and sealed to all edges.

Award

Jails / Prisons

$327,373.00

Public - State/Provincial

Renovation, Site Work

3

12

2

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
63
Bidding Soon
1,077
All Active Projects
401
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

August 12, 2024

img_map_placeholder

2605 State St, Salem, OR

Related To This Project


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.