BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Birmingham, Alabama. Working plans call for site work for a water / sewer project.

**As of July 22, 2024 project has been put on hold. Project will go out of bid next year. This document serves as the Birmingham Airport Authority's ("BAA") request for proposal ("RFP") for a qualified company ("Contractor") to add five (5) sump pumps in the airfield electrical manholes at the Birmingham - Shuttlesworth International Airport (BHM Airport) Provide and install five (5) sump pumps. One in each of the 5 vaults. See specification in Exhibit A See locations of the Five (5) sump pumps in Appendix A. Provide and install five (5) drainage pipes to the nearest drain for each vault. Trench from each vault to nearest drain Backfill trench. Provide sod to recover trenches to meet Airport/FAA standards on the airfield. Provide electrical circuits to each vault. Provide a disconnect switch in each vault Provide a small, wall mounted transformer in each vault. Provide a twist lock receptacle in weathertight box in each vault to serve as disconnect for the pump. Work to be done around the airport's schedule tentatively Midnight -4 am. Minority Business: BAA encourages all Minority Business Enterprises (MBE), and Woman Owned Enterprises (WBE) to participate in responding to this RFP. BAA has an MBE/WBE participation goal for the scope of work associated with this RFP of 4 percent (%) (the ''MBE/WBE'' Participation Goal''). Deadline for Proposal Questions/Clarifications June 27, 2024 All questions must be submitted in writing and directed to BAA's VP of Procurement at eseoane@flybhm.com in order to be considered.

Final Planning

Water / Sewer

$60,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
35
Bidding Soon
567
All Active Projects
244
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

January 22, 2025

img_map_placeholder

5900 Messer Airport Hwy, Birmingham, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.