Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of an educational facility in Koshkonong, Missouri. Completed plans call for the construction of a educational facility; and for site work for a educational facility.
Middle School Storm Shelter Hourly wages, as set forth by the Department of Labor and Industrial Relations and the prevailing wage law, will be complied with on this project. Performance Bond and Material and Labor Payment Bond in amount of 100% of contract price shall be furnished by successful bidder. If the Contractor refuses, neglects, or fails to complete the Work within the time stated in the Contract, then the Contractor and the Contractor's surety, if any, shall be liable for and shall pay the Owner, not as penalty but as liquidated damages, the sum of four hundred dollars ($400.00) for each calendar day that the Contractor is in default after the time stipulated in the Contract for completing the Work of each Phase until the Work is Substantially Complete. The Owner may withhold from payments due the Contractor, such amounts as may be assessed as liquidated damages. Upon Substantial and Final Completion of the Work, the Owner may adjust the Contract Sum by the amount of the assessed liquidated damages. Construction Schedule: Construction Schedule may start immediately and must be substantially complete by August 8, 2025. The Board reserves the right to accept or reject any or all bids and waives any informality in the bidding. Each bidder shall examine the bidding documents carefully and no later than seven days prior to the date for receipt of bids and shall make written request to the Architect for interpretation or correction of any ambiguity, inconsistency or error therein discovered. All roofs shall be laid to provide weather tight and waterproof covering for all areas roofed and all walls, chimney, vents, ventilators, hangers, braces, guy wires, frames and canopies shall be covered in such manner and in conjunction will act integrally to meet this condition. A. Provide all labor, material, tools, equipment, and supervision necessary to complete the installation of a .060 inch thick reinforced white TPO adhered Roofing System including flashings and insulation as specified herein and as indicated on the drawings in accordance with the manufacturer's most current specifications and details. B. The roofing contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work. Question Deadline 08/15/2024 Bid Result : Contractor - Gentry Construction Inc - $ 1,799,000.00 Hardware Contractor - Ron Miller Hardware - $18,825
Award
Educational
$1,632,172.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 22, 2024
October 21, 2024
100 School St, Koshkonong, MO
Related To This Project
Kansas City, MO
Bid Date: Sep 25 2024
Lebanon, MO
Bid Date: Jul 09 2024
Lebanon, MO
Bid Date: Jul 09 2024
Kansas City, MO
Bid Date: Jul 09 2024
Washington, MO
Bid Date: Jul 25 2024
Marceline, MO
Bid Date: Jul 09 2024
Jefferson City, MO
--
Ballwin, MO
Bid Date: Jul 18 2024
Cameron, MO
Bid Date: Sep 30 2021
Saint Louis, MO
Bid Date: Jul 18 2024
Kansas City, MO
Bid Date: Jul 31 2024
Kansas City, MO
Bid Date: Aug 13 2024
Leeton, MO
Bid Date: Aug 07 2024
Lees Summit, MO
Bid Date: Aug 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.