EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 11, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a conference / convention center in Washington, Pennsylvania. Completed plans call for the renovation of a conference / convention center.

This project is subject to the PA Separations Act of 1913 and is separated into four (4) prime contracts for General Trades, Mechanical, Electrical, and Plumbing, which cumulatively include the total project scope. Proposals must be on the forms furnished by the Township Engineer. The bid must be accompanied by a certified check or bid bond in the amount of ten percent (10%) of the bid price, made payable to North Franklin Township. Awarded bidder shall provide a 100% Performance Bond, 100% Payment Bond, and 10% Maintenance Bond for the project. Liquidated damages will apply at the rate of $500.00 per calendar day. Bids may be held by North Franklin Township for a period not to exceed sixty (60) days from the date of bid opening for the purpose of reviewing the bids and investigating the qualifications of Bidders, prior to awarding the contract. North Franklin Township reserves the rights to waive any informalities and to reject any or all bid proposals or any portion thereof. Attention of bidders is called to the requirements concerning the payment of not less than the prevailing wage and salary rate provisions of the Pennsylvania Prevailing Wage Act 442 for the Waterside Park Event Center Project. General Trades - Grahamboys LLC DBA Graham Construction $ 671,471.00 Electrical - S.E. Schultz Electric $ 64,500.00 Plumbing - Newman Plumbing, Inc. $ 113,665.00

Bid Results

Conference / Convention Centers

$849,636.00

Public - County

Renovation

8

15

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork
Division 08 - Openings

Division 08 - Openings

Windows, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Electrical, Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
106
Bidding Soon
1,059
All Active Projects
500
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2024

September 6, 2024

img_map_placeholder

345 Franklin Farms Rd, Washington, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Waterside Park Event Center Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.